OSHA Inspection: LARSON CONSTRUCTION CO., INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of LARSON CONSTRUCTION CO., INC. in COUNTY HWY N (S. FORK OF EC RIVER) BETWEEN WITHEE AND REEDSBURG TOWNSHIP., WITHEE, WI 54498 (NAICS 237310). OSHA activity number 346808587.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Larson Construction CO., INC. — free Get an email when a new federal OSHA severe-injury report for Larson Construction CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
COUNTY HWY N (S. FORK OF EC RIVER) BETWEEN WITHEE AND REEDSBURG TOWNSHIP.
City
WITHEE
State
WI
ZIP
54498
Mailing
19681 55TH AVENUE, CHIPPEWA FALLS, WI 54729
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
37
Ownership type
A

6 citations on file for this inspection.

1926.106 A

Serious Gravity 10 1 instance 4 exposed
Issued
Oct 5, 2023
Abate by
Oct 20, 2023
Penalty
Initial $9,297 · Current $6,508 Reduced
29 CFR  1926.106(a): Employee(s) working over or near water where the danger of drowning existed, were not provided with U.S. Coast Guard approved life jacket(s) or buoyant work vest(s):  (a) On or about June 15, 2023; the employer failed to ensure that U.S. Coast Guard approved life jackets or buoyant work vests were worn by employees while they performed bridge construction activities over, around, and in a body of water (Black River).
Recent events (2)
  • — I (S) $6507.9
  • — Z (S) $9297

1926.106 C

Serious Gravity 10 1 instance 4 exposed
Issued
Oct 5, 2023
Abate by
Oct 20, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.106(c): Ring buoys with at least 90 feet of line were not provided and readily available for emergency rescue operations:  (a) On or about June 15, 2023; the employer failed to ensure that at least one ring buoy with 90 feet of line (rope) was readily available while employees performed bridge construction activities over, around, and in a body of water (Black River).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Oct 5, 2023
Abate by
Oct 20, 2023
Penalty
Initial $9,297 · Current $6,508 Reduced
29 CFR  1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:   (a) On or about June 15, 2023; the employer failed to ensure that employees were protected from fall hazards while performing bridge construction activities from a bracket type scaffold attached to a bridge pier approximately 10 feet, 1-1/2 inches above a shallow body of water (Black River).
Recent events (2)
  • — I (S) $6507.9
  • — Z (S) $9297

1926.451 G04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Oct 5, 2023
Abate by
Oct 20, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms:    (a) On or about June 15, 2023; the employer failed to ensure that guardrail systems were installed along the north and south ends of bracket type scaffolds attached to a bridge pier before employees worked from them during bridge construction activities at heights of approximately 10 feet, 1-1/2 inches above a shallow body of water (Black River).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G04 II

Serious Gravity 10 1 instance 2 exposed
Issued
Oct 5, 2023
Abate by
Oct 20, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.451(g)(4)(ii): The top edge height of toprails on scaffolds manufactured or placed in service after January 1, 2000 were not installed between 38 and 45 inches above the platform surface and installed between 36 and 45 inches above the platform surface on scaffolds manufactured or placed in service before January 1, 2000.  (a) On or about June 15, 2023; the employer failed to ensure the top guardrail was installed between 38 and 45 inches above the platform surface before employees worked from bracket scaffolds attached to a pier during bridge construction activities at heights of approximately 10 feet, 1-1/2 inches above a shallow body of water (Black River).  In that, guardrails installed on the west and east sides were only 24 inches above the scaffold platforms.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1412 D01 XII

Serious Gravity 5 1 instance 4 exposed
Issued
Oct 5, 2023
Abate by
Nov 3, 2023
Penalty
Initial $7,969 · Current $5,578 Reduced
29 CFR  1926.1412(d)(1)(xii): The employer did not inspect the operator cab windows for significant cracks, breaks, or other deficiencies that would hamper the operator's view:  (a) Construction site located on County Road N; Cab glass on the truck crane was damaged.
Recent events (2)
  • — I (S) $5578.3
  • — Z (S) $7969

View Larson Construction CO., INC.'s full OSHA safety record →