OSHA Inspection: HORST CONSTRUCTION COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HORST CONSTRUCTION COMPANY in 2921 REACH ROAD, WILLIAMSPORT, PA 17701 (NAICS 236116). OSHA activity number 346861222.

Watch Horst Construction Company — free Get an email when a new federal OSHA severe-injury report for Horst Construction Company is published. One employer, no account, unsubscribe in one click.
Site address
2921 REACH ROAD
City
WILLIAMSPORT
State
PA
ZIP
17701
Mailing
P.O. BOX 3310, LANCASTER, PA 17604
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
6
Ownership type
A

2 citations on file for this inspection.

1926.150 C01 IV

Other-than-serious Gravity 1 3 instances 6 exposed
Issued
Abate by
Penalty
Initial $4218.00 · Current $3164.00 Reduced
29 CFR  1926.150(c)(1)(iv): There was not at least one fire extinguisher located adjacent to stairways on each floor of a multistory building:  a) New Construction Expansion: Employees were exposed to fire hazards, in a multistory building, due to a lack of fire extinguishers near the first floor stairway, on or about July 26, 2023.  b) New Construction Expansion: Employees were exposed to fire hazards, in a multistory building, due to a lack of fire extinguishers near the second floor stairway, on or about July 26, 2023.  c) New Construction Expansion: Employees were exposed to fire hazards, in a multistory building, due to a lack of fire extinguishers the third floor stairway, on or about July 26, 2023.  Abatement certification required.
Recent events (2)
  • — I (O) $3163.5
  • — Z (S) $4218

1926.405 G01 III B

Other-than-serious Gravity 1 2 instances 6 exposed
Issued
Abate by
Penalty
Initial $4218.00 · Current $3164.00 Reduced
29 CFR  1926.405(g)(1)(iii)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors:  a) 2nd floor Control Room Vestibule, South Stair Tower: Employees were exposed to shock and fire hazards due to a flexible cord being run through a hole in the wall, on or about July 26, 2023.  b) 3rd floor Vestibule, South Stair Tower: Employees were exposed to shock and fire hazards due to a flexible cord being run through a hole in the wall, on or about July 26, 2023.  Abatement certification required.
Recent events (2)
  • — I (O) $3163.5
  • — Z (S) $4218

View HORST CONSTRUCTION COMPANY's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346861222.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.