PORTSMOUTH, VA —
OSHA Inspection: ASTURIAN GROUP CONSTRUCTION
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of ASTURIAN GROUP CONSTRUCTION in NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VA 23709 (NAICS 236220). OSHA activity number 346874217.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ASTURIAN GROUP CONSTRUCTION
- Site address
- NORFOLK NAVAL SHIPYARD
- City
- PORTSMOUTH
- State
- VA
- ZIP
- 23709
- Mailing
- 760 LYNNHAVEN PARKWAY, SUITE 200, VIRGINIA BEACH, VA 23452
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 51
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.62 D01 I
- Issued
- Nov 7, 2023
- Abate by
- Dec 5, 2023
- Penalty
- Initial $9,376 · Current $6,094 Reduced
1591
General-duty citation text
29 CFR 1926.62(d)(1)(i):Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 �?g/m3) calculated as an 8-hour time-weighted average (TWA): a) Norfolk Naval Shipyard Building 261: On or about June 22, 2023, subcontractor employees were tasked to remove lead-based paint roof stiffener and weld structural supports onto the stiffener without the employer conducting an initial determination to see if any employee would be exposed at or above the action level. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $6094.4
- — Z (S) $9376
1926.62 D02 V
- Issued
- Nov 7, 2023
- Abate by
- Dec 5, 2023
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v): Until the employer performed an employee exposure assessment as required under paragraph (d) of this section and determined actual employee exposure, the employer did not provide to employees performing the tasks described in paragraphs (d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) of this section with interim, appropriate respiratory protection in accordance with paragraph (f) of this section: a) Norfolk Naval Shipyard Building 261: On or about June 22, 2023, subcontractor employees were tasked to grind lead-based paint from roof stiffeners and weld structural supports onto the stiffeners without respiratory protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.403 B02
- Issued
- Nov 7, 2023
- Abate by
- Dec 5, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) Norfolk Naval Shipyard Building 261 annex: On or about July 13, 2023, extension cords and a triple tap outlet portable GFCI line cord used by subcontractors were not used in accordance with its listing and labeling in that cords were daisy chained together to supply power to temporary lights. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1926.405 A02 II C
- Issued
- Nov 7, 2023
- Abate by
- Dec 5, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(C): Receptacles for uses other than temporary lighting was installed on branch circuits which supplied temporary lighting: a) Norfolk Naval Shipyard Building 261 annex: On or about July 13, 2023, temporary lights were installed in the overhead and plugged directly into wall receptacles used to supply power to portable electrical equipment. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Asturian Group Construction
View Asturian Group Construction's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346874217.