OSHA Inspection: CAPITAL ELECTRIC CONSTRUCTION DBA BELL ELECTRICAL CONTRACTORS

Fatality or catastrophe inspection · Safety discipline

On , OSHA opened a fatality or catastrophe safety inspection of CAPITAL ELECTRIC CONSTRUCTION DBA BELL ELECTRICAL CONTRACTORS in 231 MONSANTO AVENUE, SAUGET, IL 62201 (NAICS 238210). OSHA activity number 346960024.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Capital Electric Construction DBA Bell Electrical Contractors for free Get an email when a new federal OSHA severe-injury report for Capital Electric Construction DBA Bell Electrical Contractors is published. One employer, no account, unsubscribe in one click.
Site address
231 MONSANTO AVENUE
City
SAUGET
State
IL
ZIP
62201
Mailing
1311 NORTH HIGHWAY DRIVE, FENTON, MO 63099
Inspection type
Fatality or catastrophe (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Union (A)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
162
Ownership type
Private (A)

4 citations on file for this inspection.

1910.333 B02 II A

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Feb 9, 2024
Abate by
Mar 28, 2024
Penalty
Initial $16,131 · Current $0 Reduced
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits or equipment are deenergized.   On or about August 14, 2023, safe procedures for deenergizing all electrical energy sources located in the outdoor tank farm metal raceway were not determined prior to employees working to replace/reinstall the conductors.  The Active Group Lockout #30 "Tank Farm" procedures did not identify and address the 'Truck Loadout Pump' circuit, energized through circuit breaker #17 in the MSP-3 panel located in the DDE MCC room.
Recent events (3)
  • · F (S) $0
  • · C (S) $16131
  • · Z (S) $16131

1910.333 B02 IV B

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Feb 9, 2024
Abate by
Mar 7, 2024
Penalty
Initial $14,518 · Current $0 Reduced
29 CFR  1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and equipment parts were deenergized:   On or about August 14, 2023, a qualified person did not use test equipment to test and verify a 480-volt conductor for the 'Truck Loadout Pump' circuit, energized through circuit breaker #17 in the MSP-3 panel located in the DDE MCC room was deenergized prior to work started to replace wiring in the outdoor raceway.
Recent events (3)
  • · F (S) $0
  • · C (S) $14518
  • · Z (S) $14518

1910.335 A01 I

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Feb 9, 2024
Abate by
Mar 7, 2024
Penalty
Initial $14,518 · Current $0 Reduced
29 CFR 1910.335(a)(1)(i): Employees working in areas where there were potential electrical hazards were not provided with electrical protective equipment that was appropriate for the specific parts of the body that needed to be protected and for the work being performed:  On or about August 14, 2023, employees working to repair/replace electrical wiring in an outdoor electrical raceway containing 480-volt conductors to various electrical circuits, did not utilize electrical protective equipment such as, but not limited to, gloves.
Recent events (3)
  • · F (S) $0
  • · C (S) $14518
  • · Z (S) $14518

1904.39 A02

Other-than-serious 1 instance 1 exposed
Issued
Feb 9, 2024
Abate by
Jun 16, 2025
Penalty
Initial $10,372 · Current $10,372
29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in the in-patient hospitalization, amputation or the loss of an eye.  On or about August 14, 2023, the employer did not report within 24-hours a work-related incident resulting in an in-patient hospitalization.
Recent events (3)
  • · F (O) $10372
  • · C (O) $10372
  • · Z (O) $10372

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 346960024.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.