GLENN HEIGHTS, TX ·
OSHA Inspection: CAP MASONRY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CAP MASONRY in 2308 FRIO RIVER, GLENN HEIGHTS, TX 75154 (NAICS 238140). OSHA activity number 347012759.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CAP MASONRY
- Site address
- 2308 FRIO RIVER
- City
- GLENN HEIGHTS
- State
- TX
- ZIP
- 75154
- Mailing
- 934 INDIAN HILLS DR,, GRAND PRAIRIE, TX 75051
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.451 B01 I
- Issued
- Jan 24, 2024
- Abate by
- Feb 20, 2024
- Penalty
- Initial $4,148 · Current $4,148
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. a. On or about October 4, 2023 Employee(s) were working on scaffolding that was not fully planked.
Recent events (1)
- · Z (S) $4148
1926.451 C02
- Issued
- Jan 24, 2024
- Abate by
- Feb 20, 2024
- Penalty
- Initial $2,765 · Current $2,765
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates and mud sills or other adequate firm foundation: a. On or about October 4, 2023 employees were working on scaffolding with at least 4 missing mud sills
Recent events (1)
- · Z (S) $2765
1926.451 C02 II
- Issued
- Jan 24, 2024
- Abate by
- Feb 20, 2024
- Penalty
- Initial $2,765 · Current $2,765
General-duty citation text
29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units: a. On or about October 4, 2023 employees were working on scaffolding with unstable material under one of the legs.
Recent events (1)
- · Z (S) $2765
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 347012759.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.