OSHA Inspection: PSS MANUFACTURING COMPANY, INC.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of PSS MANUFACTURING COMPANY, INC. in 405 SCHOOL ROAD, DENVER, PA 17517 (NAICS 332999). OSHA activity number 347135113.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch PSS Manufacturing Company, INC. — free Get an email when a new federal OSHA severe-injury report for PSS Manufacturing Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
405 SCHOOL ROAD
City
DENVER
State
PA
ZIP
17517
Mailing
405 SCHOOL ROAD, DENVER, PA 17517
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
332999
Employees
13
Ownership type
A

6 citations on file for this inspection.

1910.252 B02 III

Serious Gravity 5 1 instance 9 exposed
Issued
May 14, 2024
Penalty
Initial $5,531 · Current $5,531

Hazardous substances 8370

29 CFR 1910.252(b)(2)(iii):  Workers and other persons adjacent to the welding area were not protected from the rays by noncombustible or flameproof screens or shields:  a.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - Welding Section - Employees conducting machine press operations adjacent to the welding section were not protected from welding arc flash, on or about November 30, 2023.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $5531
  • — Z (S) $5531

1910.1200 E01

Serious Gravity 5 2 instances 13 exposed
Issued
May 14, 2024
Abate by
Jun 17, 2024
Penalty
Initial $3,687 · Current $3,687
29 CFR  1910.1200(e)(1): The employer did not develop, implement and maintain at the workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g) and (h) of this section for labels and other forms of warning, material safety data sheets, and employee information and training will be met, and had not developed or implemented a written hazard communication program which included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):  a.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - Company Wide - Employees were using chemicals including, but not limited to, petroleum-based products, paints, and solvents. The employer did not develop, implement, or maintain a workplace written hazard communication program, on or about November 30, 2023.  b.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - Company Wide - Employees were using chemicals including, but not limited to, petroleum-based products, paints, and solvents.  The employer did not compile a list of the hazardous chemicals known to be present using a product identifier that was referenced on the appropriate safety data sheet(s), on or about November 30, 2023.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $3687
  • — Z (S) $3687

1910.1200 H01

Serious Gravity 5 1 instance 13 exposed
Issued
May 14, 2024
Abate by
Jun 17, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:    a.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - Company Wide - Employees were using chemicals including, but not limited to, petroleum-based products, paints, and solvents. The employer did not provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new physical or health hazard the employees had not previously been trained about was introduced into their work area, on or about November 30, 2023.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1910.95 C01

Serious Gravity 5 1 instance 13 exposed
Issued
May 14, 2024
Abate by
Jun 17, 2024
Penalty
Initial $3,687 · Current $3,687

Hazardous substances 81108111

29 CFR 1910.95(c)(1): The employer did not administer a continuing, effective hearing conservation program as described in 29 CFR 1910.9(c) through (o) whenever employee noise exposures equal or exceed an 8-hour time-weighted average sound level of 85 decibels measured on the A scale, or equivalently a dose of fifty percent:  a.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - On or about March 25, 2024, the employer did not institute a continuing and effective hearing conservation program when employees' nose exposure exceeded an 8 hour time weighted average sound level of 85 dBA.  A.	Quest Technology Edge 5 dosimeter (Serial # EST080227) placed on an employee conducting shift lead operations was exposed to noise at a level of 81.1% of the allowable limit during a 480 minute sampling period on March 25, 2024; exposure calculations included a zero increment for the 30 minutes not sampled. This exposure is equivalent to a sound level of 88.4 dBA for the dose and time of the employee exposure.  B.	Quest Technology Edge 5 dosimeter (Serial # EST080228) placed on an employee conducting machine press (steak press) operations was exposed to noise at a level of 160.1% of the allowable limit during a 480 minute sampling period on March 25, 2024; exposure calculations included a zero increment for the 30 minutes not sampled. This exposure is equivalent to a sound level of 93.3 dBA for the dose and time of the employee exposure.  C.	Quest Technology Edge 5 dosimeter (Serial # EST080229) placed on an employee conducting welding operations was exposed to noise at a level of 76.4% of the allowable limit during a 480 minute sampling period on March 25, 2024; exposure calculations included a zero increment for the 30 minutes not sampled. This exposure is equivalent to a sound level of 88 dBA for the dose and time of the employee exposure.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $3687
  • — Z (S) $3687

1910.95 K01

Serious Gravity 5 1 instance 13 exposed
Issued
May 14, 2024
Abate by
Jun 17, 2024
Penalty
Initial $0 · Current $0

Hazardous substances 81108111

29 CFR 1910.95(k)(1): The employer did not train each employee who is exposed to noise at or above an 8-hour time-weighted average of 85 decibels in accordance with the requirements of 29 CFR 1910.95(k):   a.) PSS Manufacturing Company, Inc., 405 School Road, Denver, PA - Facility Wide - Employees were exposed to noise levels at or above the action level of 85 dBA and did not have hearing conservation training, on or about March 25, 2024.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1910.95 G01

Serious Gravity 5 1 instance 13 exposed
Issued
May 14, 2024
Abate by
Jul 16, 2024
Penalty
Initial $0 · Current $0

Hazardous substances 81108111

29 CFR  1910.95(g)(1): The employer did not establish and maintain an audiometric testing program as provided by 29 CFR 1910.95(g) by making audiometric testing available to all employees whose exposures equal or exceed an 8-hour time-weighted average of 85 decibels:   a.) PSS Manufacturing Company Inc., 405 School Road, Denver, PA - Facility Wide - The employer did not establish and maintain an audiometric testing program by making audiometric testing available to all employees whose exposures equaled or exceeded an 8-hour time-weighted average of 85 decibels, on or about  on or about March 25, 2024.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

View PSS Manufacturing Company, INC.'s full OSHA safety record →