VERO BEACH, FL —
OSHA Inspection: STRUCTURE-CON LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of STRUCTURE-CON LLC in 107 SPRING LAKE COURT BUILDING# 88, VERO BEACH, FL 32962 (NAICS 238190). OSHA activity number 347195406.
Where did this inspection happen?
- Establishment
- STRUCTURE-CON LLC
- Site address
- 107 SPRING LAKE COURT BUILDING# 88
- City
- VERO BEACH
- State
- FL
- ZIP
- 32962
- Mailing
- PO BOX 2626, OKEECHOBEE, FL 34973
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238190
- Employees
- 20
- Ownership type
- A
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $6452.00 · Current $3871.00 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm in that employees were exposed to fall, struck by and caught-in between hazards: On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida, 32962, employees were exposed to fall, struck by and caught-in between hazards while riding in the loader and/or standing in the rear of a tractor.
Recent events (2)
- — I (S) $3871.2
- — Z (S) $6452
1926.95 A
- Issued
- Abate by
- Penalty
- Initial $2765.00 · Current $1659.00 Reduced
General-duty citation text
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided: On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a chemical hazard while performing concrete restoration work using hazardous materials such as, but not limited to portland cement, without gloves and safety glasses.
Recent events (2)
- — I (S) $1659
- — Z (S) $2765
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $5531.00 · Current $3319.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a 7-foot fall hazard while performing concrete restoration work from a tubular welded frame scaffold that was not fully planked.
Recent events (2)
- — I (S) $3318.6
- — Z (S) $5531
1926.451 C02
- Issued
- Abate by
- Penalty
- Initial $5531.00 · Current $3319.00 Reduced
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: On or about 1/04/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a 7-foot fall hazard while performing concrete restoration work from a tubular welded frame scaffold that lacked mudsills and/or base plates.
Recent events (2)
- — I (S) $3318.6
- — Z (S) $5531
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $5531.00 · Current $3319.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross braces were used as a means of access. On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a 7-foot fall hazard while performing concrete restoration work from a tubular welded frame scaffold that lacked an adequate access.
Recent events (2)
- — I (S) $3318.6
- — Z (S) $5531
1926.452 C02
- Issued
- Abate by
- Penalty
- Initial $5531.00 · Current $3319.00 Reduced
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a 7-foot fall hazard while performing concrete restoration work from a tubular welded frame scaffold that lacked a cross brace.
Recent events (2)
- — I (S) $3318.6
- — Z (S) $5531
1926.454 A
- Issued
- Abate by
- Penalty
- Initial $5531.00 · Current $3319.00 Reduced
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold(s) trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards: On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees were exposed to a 7-foot fall hazard while performing concrete restoration work from a tubular welded frame scaffold without training.
Recent events (2)
- — I (S) $3318.6
- — Z (S) $5531
1926.454 B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in: On or about 1/4/2024 and at times prior, at Building #88, 107 Spring Lake Court, Vero Beach, Florida 32962, employees who erected scaffolding were not trained, exposing employees who worked from a tubular welding frame scaffold while performing concrete restoration work to a 7-foot fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238190)
BALDWINSVILLE, NY—2026-07-10
GD MAPSTONE, INC.
SAN ANTONIO, TX—2026-07-08
CAPITAL FOUNDATIONS, INC.
LITTLE FALLS, NJ—2026-07-07
ELITE CONTRACT GROUP
YAKIMA, WA—2026-07-07
WA317991947 - CASCADE WELDING SERVICES LLC
REDDING, CA—2026-07-07
JEFFERSON STATE BUILDERS INC
More inspections in FL
MARIANNA, FL—2026-07-13
PRIMETIME MOBILE MASONRY LLC
MELBOURNE, FL—2026-07-13
OMNIPOTENT BRANDS, LLC
QUINCY, FL—2026-07-13
WALMART
INDIAN ROCKS BEACH, FL—2026-07-10
UNKNOWN CONTRACTOR
CLEARWATER, FL—2026-07-10
ROOFTECH ROOFING & WATERPROOFING INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347195406.