OSHA Inspection: DHL EXPRESS (USA), INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DHL EXPRESS (USA), INC. in 141 SOUTH STREET, UNIT #3, WEST HARTFORD, CT 06110 (NAICS 492110). OSHA activity number 347201238.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch DHL Express (USA), INC. — free Get an email when a new federal OSHA severe-injury report for DHL Express (USA), INC. is published. One employer, no account, unsubscribe in one click.
Site address
141 SOUTH STREET, UNIT #3
City
WEST HARTFORD
State
CT
ZIP
06110
Mailing
141 SOUTH STREET, UNIT #3, WEST HARTFORD, CT 06110
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
492110
Employees
68
Ownership type
A

5 citations on file for this inspection.

1910.22 D02

Other-than-serious Gravity 5 1 instance 2 exposed
Issued
Feb 28, 2024
Penalty
Initial $6,464 · Current $0 Reduced
29 CFR  1910.22(d)(2): The employer did not ensure that hazardous conditions on walking-working surfaces are corrected or repaired before an employee uses the walking-working surface again or the employer did not ensure that if the correction or repair cannot be made immediately, the hazard is guarded to prevent employees from using the walking-working surface until the hazard is corrected or repaired:  Exterior Dock Stairs:  On, or about, January 9, 2024, the wrought iron stair railing provided on the left side descending had been broken off after the stairs were hit by a trailer.  The stairs were used daily.
Recent events (2)
  • — I (O) $0
  • — Z (S) $6464

1910.303 B02

Serious Gravity 5 2 instances 10 exposed
Issued
Feb 28, 2024
Penalty
Initial $9,507 · Current $9,500 Reduced
29 CFR  1910.303(b)(2):  Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  Sorting Area:  On, or about, January 9, 2024, in the following locations, relocatable power taps were energized through extension cords:  A.	X-ray machine. B.	Bulk Processing Area.
Recent events (2)
  • — I (S) $9500
  • — Z (S) $9507

1910.304 G05

Serious Gravity 5 1 instance 10 exposed
Issued
Feb 28, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.304(g)(5):  The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:  Sorting Area:  On, or about January 9, 2024, a relocatable power tap was used to energize five electronic components such as a CPU, monitor and scanner.  All of the components were provided with an equipment grounding conductor.  The relocatable power tap was energized by a two-wire extension cord that did not include an equipment grounding conductor.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV A

Deleted Serious Gravity 1 3 instances 68 exposed
Issued
Feb 28, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.305(g)(1)(iv)(A):  Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  On, or about, January 9, 2024, in the following locations, extension cords were used in lieu of permanent wiring:  A.	Sorting Area, X-ray machine. B.	Sorting Area, Bulk Processing Area. C.	Meeting Area, television monitor.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 G01 I A

Other-than-serious 1 instance 2 exposed
Issued
Feb 28, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.303(g)(1)(i)(A):  For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910:  Shop Area:  On, or about, January 9, 2024, protective railings were installed in the working space of Panel RP-1, a General Electric 480/277 volt panel board.  The working space required in Table S-1 was 42 inches, the railing was measured to be 37 inches from the face of the panel enclosure.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View DHL Express (USA), INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347201238.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.