Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DANIEL NOEL'S FIBERGLASS

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of DANIEL NOEL'S FIBERGLASS in 1595 PEACHTREE PKWY, CUMMING, GA 30041 (NAICS 334513). OSHA activity number 347205445.

Watch Daniel Noel'S Fiberglass — free Get an email when a new federal OSHA severe-injury report for Daniel Noel'S Fiberglass is published. One employer, no account, unsubscribe in one click.
Site address
1595 PEACHTREE PKWY
City
CUMMING
State
GA
ZIP
30041
Mailing
6245 BARRETT RD, CUMMING, GA 30028
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
334513
Employees
5
Ownership type
A

4 citations on file for this inspection.

1910.1200 E01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3687.00 · Current $3687.00
29 CFR  1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):    a) Production shop - On or about January 10, 2024, and at times prior, employees were exposed to chemical hazards and fire hazards  in that, the employer failed to implement a written hazard communication program for employees working with the hazardous chemicals such as, but not limited to resin, catalyst and paint during the finishing fiberglass process at the facility.
Recent events (1)
  • — Z (S) $3687

1910.1200 H01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.1200(h)(1):Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:  a)Production shop - On or about January 10, 2024, and at times prior, employees were exposed to chemical hazards and fire hazards in that, the employer failed to provide effective information and training to employees working with hazardous chemicals such as, but not limited to resin, catalyst and paint during the finishing fiberglass process at the facility.
Recent events (1)
  • — Z (S) $0

1910.134 E01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.134(e)(1):The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:  a) Production shop - On or about January 10, 2024, and at times prior, employees were exposed to respiratory hazards in that, the employer failed to ensure a medical evaluation was provided to employees to determine the employees' ability to use a respirator before employees required to use the respirators in the finishing fiberglass process at the facility.
Recent events (1)
  • — Z (O) $0

1904.29 A

Other-than-serious 1 instance 1 exposed
Issued
Penalty
Initial $922.00 · Current $922.00
29 CFR  1904.29(a): The employer did not use an OSHA 300, 301 and 300A Form or equivalent.  a) Throughout the facility - On or about January 10, 2024, and times prior, the employer failed to ensure that an OSHA 300, 301 and 300A Form or equivalent were maintained for Calendar years 2020 to 2014  when the establishment employed 14 employees.
Recent events (1)
  • — Z (O) $922

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347205445.