OSHA Inspection: VELECELA CONSTRUCTION LLC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of VELECELA CONSTRUCTION LLC in 823 SOUTH 18TH ST, NEWARK, NJ 07108 (NAICS 238170). OSHA activity number 347359150.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Velecela Construction LLC — free Get an email when a new federal OSHA severe-injury report for Velecela Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
823 SOUTH 18TH ST
City
NEWARK
State
NJ
ZIP
07108
Mailing
1734 MARTINE AVE, SCOTCH PLAINS, NJ 07076
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238170
Employees
3
Ownership type
A

6 citations on file for this inspection.

1903.19 D01

Other-than-serious 1 instance 10 exposed
Issued
Jun 16, 2025
Abate by
Jun 30, 2025
Penalty
Initial $398 · Current $398
29 CFR  1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  a) Worksite located at 823 South 18th St, Newark, NJ  The employer did not provide abatement certification and documentation for inspection number 1735915: Citation 1 Item 1 - 29 CFR 1926.451(f)(7) Citation 1 Item 2 - 29 CFR 1926.451(g)(1)(vii) Citation 1 Item 3 - 29 CFR 1926.451(g)(4)(i) Citation 1 Item 5 - 29 CFR 1926.452(j)(2)  The citations were issued on 09/19/2024, received by the employer on 09/19/2024 and became a final order on 10/15/2024.  Violation occurred on or about 05/28/2025.
Recent events (1)
  • — Z (O) $398

1926.451 F07

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Oct 4, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  a. 823 South 18th St, Newark, NJ 07108  The employer did not ensure that the Werner pump jack scaffolds were erected by a competent person.  Violation occurred on or about 03/20/ 2024.
Recent events (1)
  • — Z (S) $4839

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Oct 4, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(g)(1)(vii):Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  a. 823 South 18th St, Newark, NJ 07108  The employer did not ensure that employees working from Alum-A-Pole Pro-Jack Pump Jack scaffold , at approximately 10 feet, were protected from fall hazards.  Employees installing Exterior sidings to the building exterior were not utilizing a personal fall arrest system on a scaffold platform that did not have end-rails installed.  Violation occurred on or about 03/20/ 2024.
Recent events (1)
  • — Z (S) $4839

1926.451 G04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Oct 4, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(g)(4)(i):Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews:  a. 823 South 18th St, Newark, NJ 07108   The employer did not ensure that employees working from Alum-A-Pole Pro-Jack Pump Jack scaffolding, at approximately 10 feet, were protected from fall hazards. Employees installing sidings to the building, used the scaffolds where guardrails were not provided at the ends of the scaffold platforms.   Violation occurred on or about 03/20/ 2024.
Recent events (1)
  • — Z (S) $4839

1926.451 G04 III

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Oct 4, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(g)(4)(iii):Midrails were not installed midway between the top rail and the platform surface  a. 823 South 18th St, Newark, NJ 07108   The employer did not ensure that employees working from Alum-A-Pole Pro-Jack Pump Jack scaffolding, at approximately 10 feet, were protected from fall hazards. Employees installing sidings to the building used scaffolds where mid rails or nets were installed between the top rail and the platform surface to prevent the workers from falling.  Violation occurred on or about 03/20/ 2024.
Recent events (1)
  • — Z (S) $4839

1926.452 J02

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Oct 4, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary:  a. 823 South 18th St, Newark, NJ 07108   Employees worked on a Alum-A-Pole Pro-Jack Pump Jack scaffold without securing the poles to a structure. The employees were working at a height of approximately 10 feet, installing sidings without having the scaffold pole base secured to the structure, which affected the stability of the scaffolds and prevented displacement.   Violation discovered on or about 03/20/2024
Recent events (1)
  • — Z (S) $4839

View Velecela Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347359150.