SOUTHWICK, MA —
OSHA Inspection: JERSEY RACK INSTALLATION LLC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of JERSEY RACK INSTALLATION LLC. in 201 COLLEGE HWY, SOUTHWICK, MA 01077 (NAICS 238990). OSHA activity number 347363806.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JERSEY RACK INSTALLATION LLC.
- Site address
- 201 COLLEGE HWY
- City
- SOUTHWICK
- State
- MA
- ZIP
- 01077
- Mailing
- 23 HOWELL PLACE, KEARNY, NJ 07032
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 6
- Ownership type
- A
Citations
8 citations on file for this inspection.
1903.19 C01
- Issued
- Sep 11, 2024
- Abate by
- Oct 22, 2024
- Penalty
- Initial $388 · Current $0 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer did not certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section: As of September 10, 2024, the employer had not provided abatement certification for Inspection number 1736380, which was issued on May 23, 2024, and required abatement certification for Citation 1, Item 3a and Item 3b, which were due on July 12, 2024, with respect to a work location at 201 College Hwy, Southwick, MA.
Recent events (2)
- — I (O) $0
- — Z (O) $388
1903.19 D01
- Issued
- Sep 11, 2024
- Abate by
- Oct 22, 2024
- Penalty
- Initial $388 · Current $0 Reduced
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency, along with the information on abatement certification required by paragraph (c)(1) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: As of September 10, 2024, the employer had not provided abatement documentation for Inspection number 1736380, which was issued on May 23, 2024, and required abatement documentation for Citation 1, Item 3a and Item 3b, which were due on July 12, 2024, with respect to a work location at 201 College Hwy, Southwick, MA.
Recent events (2)
- — I (O) $0
- — Z (O) $388
1926.501 B10
- Issued
- May 23, 2024
- Penalty
- Initial $4,839 · Current $4,839
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: 201 College Hwy, Southwick, MA : On or about December 18, 2023, and at times prior, the employer did not ensure that employees were protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or by an assigned safety monitor while working at a height of approximately 20 feet above a lower level during a commercial solar installation project.
Recent events (1)
- — Z (S) $4839
1926.502 F01
- Issued
- May 23, 2024
- Penalty
- Initial $4,839 · Current $4,839
General-duty citation text
29 CFR 1926.502(f)(1): Warning lines were not erected around all sides of the roof work area: 201 College Hwy, Southwick, MA: On or about December 18, 2023, and at times prior, the employer did not ensure that warning lines were placed around the perimeter of a commercial construction project involving solar panel installation where employees were exposed to fall heights of approximately 20 feet above a lower level.
Recent events (1)
- — Z (S) $4839
1926.502 F01 I
- Issued
- May 23, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(f)(1)(i): When no mechanical equipment was being used the warning line was not erected at least 6 feet (1.8m) from the roof edge: 201 College Hwy, Southwick, MA: On or about December 18, 2023, and at times prior, the employer did not ensure that the warning line system used for fall protection was placed at least six feet from the edge of the roof, exposing employees to fall hazards of 20 feet during a commercial construction project involving solar panel installation.
Recent events (1)
- — Z (S) $0
1926.502 F02
- Issued
- May 23, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(f)(2): Warning line systems did not consist of ropes, wires, or chains: 201 College Hwy, Southwick, MA: On or about December 18, 2023, and at times prior, a warning line system was installed around the perimeter of a roof work area that consisted of yellow caution tape in lieu of ropes, wires, or chains, and exposed employees to fall heights of 20 feet during a commercial construction project that involved solar panel installation.
Recent events (1)
- — Z (S) $0
1926.503 A01
- Issued
- May 23, 2024
- Abate by
- Jul 12, 2024
- Penalty
- Initial $4,839 · Current $4,839
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: 201 College Hwy, Southwick, MA: On or about December 18, 2023, and at times prior, the employer had not trained employees to recognize fall hazards and on the procedures to be followed to minimize these hazards, prior to exposure to fall heights of approximately 20 feet during a commercial construction project involving solar panel installation.
Recent events (1)
- — Z (S) $4839
1926.503 B01
- Issued
- May 23, 2024
- Abate by
- Jul 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. 201 College Hwy, Southwick, MA: On or about December 18, 2023, and at times prior, the employer had not prepared a written certification record of fall protection training which included the name or other identity of the person trained, the signature of the person trained, date(s) the training was completed, and the signature of the person who conducted the training for an employee who was performing solar panel installation work and exposed to fall hazards of approximately 20 feet above a lower level.
Recent events (1)
- — Z (S) $0
More inspections at Jersey Rack Installation LLC.
View Jersey Rack Installation LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 238990)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347363806.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.