Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ST. PIERRE MANUFACTURING CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ST. PIERRE MANUFACTURING CORPORATION in 317 EAST MOUNTAIN ST, WORCESTER, MA 01606 (NAICS 332999). OSHA activity number 347385726.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ST. Pierre Manufacturing Corporation — free Get an email when a new federal OSHA severe-injury report for ST. Pierre Manufacturing Corporation is published. One employer, no account, unsubscribe in one click.
Site address
317 EAST MOUNTAIN ST
City
WORCESTER
State
MA
ZIP
01606
Mailing
317 EAST MOUNTAIN ST, WORCESTER, MA 01606
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332999
Employees
19
Ownership type
A

4 citations on file for this inspection.

1910.147 C01

Serious Gravity 10 1 instance 15 exposed
Issued
Apr 12, 2024
Abate by
Jun 28, 2024
Penalty
Initial $6,452 · Current $5,000 Reduced
29 CFR  1910.147(c)(1):The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: 317 East Mountain St, Worcester, MA:  On and before April 2, 2024, the employer had not established an energy control program to protect employees and outside contractors who performed maintenance and servicing activities on company machinery. Abatement Notes:  Energy control procedures are required to be documented for all multiple-energy source machines including the mechanical power shear. Energy control training is required to be documented and provided for all employees who are, or may be, in an area where energy control procedures may be utilized. A periodic inspection shall include the following elements:  - Appointment of an authorized employee to inspect each local procedure for deviations and inadequacies during an energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections. *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (3)
  • — P (S) $5000
  • — I (S) $5000
  • — Z (S) $6452

1910.178 L04 III

Other-than-serious Gravity 5 1 instance 6 exposed
Issued
Apr 12, 2024
Abate by
Jun 28, 2024
Penalty
Initial $3,687 · Current $0 Reduced
29 CFR  1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: 317 East Mountain St, Worcester, MA:  On and for many years before April 2, 2024, the employer had not conducted triennial performance evaluations of any powered industrial truck operators.
Recent events (3)
  • — P (O) $0
  • — I (O) $0
  • — Z (S) $3687

1910.217 C01 I

Serious Gravity 10 1 instance 4 exposed
Issued
Apr 12, 2024
Abate by
Sep 20, 2024
Penalty
Initial $6,452 · Current $5,000 Reduced
29 CFR  1910.217(c)(1)(i):  The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es) to conform to the maximum permissible openings of Table O-10:   317 East Mountain St, Worcester, MA:  On and before April 2, 2024, employees operated three mechanical power presses to assemble chain products.  None of the three presses had guarding or devices to prevent employee access to their points of operation.
Recent events (3)
  • — P (S) $5000
  • — I (S) $5000
  • — Z (S) $6452

1910.179 J03

Other-than-serious 1 instance 3 exposed
Issued
Apr 12, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.179(j)(3):  Periodic inspection. Complete inspections of the crane were not performed at intervals as generally defined in paragraph (j)(1)(ii)(b) of this section, depending upon its activity, severity of service, and environment, or as specifically indicated below.  These inspections did not include the requirements of paragraph (j)(2) of this section and the items specified in subparagraphs (j)(3)(i) through (x): 317 East Mountain St, Worcester, MA:  On and for more than a year before April 2, 2024, the employer had not performed a complete crane inspection of their overhead crane.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View ST. Pierre Manufacturing Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347385726.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.