Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HAFFNER'S ENERGY NORTH, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of HAFFNER'S ENERGY NORTH, INC. in 323 ROOSEVELT TRAIL, NAPLES, ME 04055 (NAICS 445120). OSHA activity number 347413890.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Haffner'S Energy North, INC. — free Get an email when a new federal OSHA severe-injury report for Haffner'S Energy North, INC. is published. One employer, no account, unsubscribe in one click.
Site address
323 ROOSEVELT TRAIL
City
NAPLES
State
ME
ZIP
04055
Mailing
2 INTERNATIONAL WAY, LAWRENCE, MA 01843
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
445120
Employees
251
Ownership type
A

10 citations on file for this inspection.

1910.22 D01

Other-than-serious Gravity 1 15 instances 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $6,913 · Current $0 Reduced
29 CFR 1910.22(d)(1): The employer did not ensure that walking-working surfaces are inspected regularly and maintained in a safe condition:  Basement - The employer did not ensure that walking-working surfaces at basement level were maintained in a safe and dry condition.
Recent events (2)
  • — I (O) $0
  • — Z (S) $6913

1910.141 A03

Deleted Serious Gravity 1 5 instances 10 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.141(a)(3): The employer did not ensure that all places of employment were kept clean to the extent that the nature of the work allowed:  Basement - �The employer failed to remediate water infiltration, which caused mold and/or mildew on the walls of the building.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.151 C

Deleted Serious Gravity 1 3 instances 20 exposed
Issued
May 20, 2024
Abate by
Jun 14, 2024
Penalty
Initial $6,913 · Current $0 Reduced
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:  Basement - The employer failed to provide a suitable eye wash station while requiring employees to use corrosive chemicals such as Clorox bleach and Pro-Con Neon.
Recent events (2)
  • — I (S) $0
  • — Z (S) $6913

1910.303 G02 I

Serious Gravity 10 1 instance 2 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $16,131 · Current $16,131
29 CFR 1910.303(g)(2) (i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by approved cabinets, other forms of approved enclosures, or other means listed under this provision:  Ceiling - The employer did not ensure live electrical wires hanging from the basement ceiling were guarded against accidental contact.
Recent events (2)
  • — I (S) $16131
  • — Z (S) $16131

1910.305 B02 I

Serious Gravity 10 1 instance 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose:  Ceiling - The employer did not ensure a junction box containing live wires located on the basement ceiling was covered to protect against accidental contact.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV A

Serious Gravity 1 4 instances 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $6,913 · Current $0 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  Basement - The employer used two flexible extension cords as permanent wiring in the basement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $6913

1910.305 G01 IV B

Serious Gravity 1 2 instances 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used to run through holes in walls, ceilings, or floors:  Basement - The employer was using flexible extension cords that originated in the basement and were routed through the floor in two locations to provide power to the main level.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV C

Serious Gravity 5 2 instances 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(C): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be run through doorways, windows, or similar openings:  Basement - The employer used flexible extension cords through doorways in at least two locations to provide power on the basement level.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H02 III

Deleted Serious Gravity 1 1 instance 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $6,913 · Current $0 Reduced
29 CFR 1910.1200(h)(2)(iii): The employer did not provide information to the employees as to the location and availability of the written hazard communication program and material safety data sheets required by 29 CFR 1910.1200:  Facility - The employer did not provide information to the employees as to the location and availability of the hazard communication program and safety data sheets.
Recent events (2)
  • — I (S) $0
  • — Z (S) $6913

1910.157 E02

Deleted Other-than-serious 2 instances 50 exposed
Issued
May 20, 2024
Abate by
Jul 9, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.157(e)(2): Portable fire extinguishers were not visually inspected at least monthly:  Basement - The employer did not ensure two portable fire extinguishers were inspected monthly.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347413890.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.