AMARILLO, TX —
OSHA Inspection: DAVID M FRYE III
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DAVID M FRYE III in 4408 S. ROCKING CHAIR LANE, AMARILLO, TX 79124 (NAICS 238130). OSHA activity number 347427759.
Where did this inspection happen?
- Establishment
- DAVID M FRYE III
- Site address
- 4408 S. ROCKING CHAIR LANE
- City
- AMARILLO
- State
- TX
- ZIP
- 79124
- Mailing
- 6906 COLUMBIA, AMARILLO, TX 79109
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 5
- Ownership type
- A
Citations
8 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $398.00 · Current $398.00
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date. that the cited violation had been abated: (a) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 1a issued on 06/18/2024 with an abatement due date of 04/07/2025. (b) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 1b issued on 06/18/2024 with an abatement due date of 04/07/2025. (c) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 1c issued on 06/18/2024 with an abatement due date of 04/07/2025. (d) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 1d issued on 06/18/2024 with an abatement due date of 04/07/2025. (e) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 2 issued on 06/18/2024 with an abatement due date of 04/07/2025. (f) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 3a issued on 06/18/2024 with an abatement due date of 04/07/2025. (g) On or about 04/14/2025, the employer failed to submit certification of corrective action for citation 1, item 3b issued on 06/18/2024 with an abatement due date of 04/07/2025.
Recent events (1)
- — Z (O) $398
1926.451 B01
- Issued
- Penalty
- Initial $2074.00 · Current $726.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) On or about April 17, 2024 employees utilizing a tubular welded scaffold were working on levels that were not fully planked or decked.
Recent events (3)
- — R (S) $725.9
- — C (S) $2074
- — Z (S) $2074
1926.451 C02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates and mud sills or other adequate firm foundation: On or about April 17, 2024 employees utilizing a tubular welded scaffold were working on scaffolds that did not bear on base plates and mud sills.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. On or about April 17, 2024 employees utilizing a tubular welded scaffold were working on scaffolds that did not ladder access to high levels of the scaffold.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 F15
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(f)(15): Ladders were used on scaffolds to increase the working level height of employees: without satisfying the criteria of subparagraphs (i) - (iv) of this paragraph. On or about April 17, 2024 employees utilizing a tubular welded scaffold were working on from a ladder that was being used to increase the working level height of employees.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.501 B13
- Issued
- Penalty
- Initial $2074.00 · Current $726.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): On or about April 17, 2024 employees were working without adequate fall protection while performing decking work on the roof of a single story home.
Recent events (3)
- — R (S) $725.9
- — C (S) $2074
- — Z (S) $2074
1926.1053 B01
- Issued
- Penalty
- Initial $2074.00 · Current $726.00 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: On or about April 17, 2024 employees were utilizing an extension ladder that was not extended at least 3 feet above the upper landing surface being accessed while decking the roof of a single story home.
Recent events (3)
- — R (S) $725.9
- — C (S) $2074
- — Z (S) $2074
1926.1053 B04
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: On or about April 17, 2024 employees utilizing an A frame ladder were leaning it as apposed to utilizing the metal spreader while conducting framing operations on a residential home.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in TX
WICHITA FALLS, TX—2026-07-16
UNITED RENTALS, INC.
SAN MARCOS, TX—2026-07-16
CASA MECHANICAL SERVICES, LTD.
CLARKSVILLE, TX—2026-07-15
SEQUOIAS TREE EXPERT LLC
EL PASO, TX—2026-07-15
SURE STEEL
CORPUS CHRISTI, TX—2026-07-15
NORTH STAR ENERGY SOLUTIONS LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347427759.