EL PASO, TX —
OSHA Inspection: J & L PLASTERING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of J & L PLASTERING in 13520 EASTLAKE BUILDING #2, EL PASO, TX 79927 (NAICS 238160). OSHA activity number 347453037.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- J & L PLASTERING
- Site address
- 13520 EASTLAKE BUILDING #2
- City
- EL PASO
- State
- TX
- ZIP
- 79927
- Mailing
- P.O. BOX 1926, FABENS, TX 79838
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 15
- Ownership type
- A
Citations
6 citations on file for this inspection.
1903.19 D01
- Issued
- Nov 29, 2024
- Abate by
- Jan 3, 2025
- Penalty
- Initial $518 · Current $518
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. a) On or about November 29, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 1 issued on September 13, 2024, with an abatement due date of October 15, 2024. b) On or about November 29, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 2 issued on September 13, 2024, with an abatement due date of October 15, 2024. c) On or about November 29, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 3 issued on September 13, 2024, with an abatement due date of October 15, 2024. d) On or about November 29, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 5 issued on September 13, 2024, with an abatement due date of October 15, 2024.
Recent events (1)
- — Z (O) $518
1926.451 B01
- Issued
- Sep 13, 2024
- Abate by
- Oct 15, 2024
- Penalty
- Initial $6,452 · Current $3,900 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as follows: On or about April 30, 2024, on the west side of building #2; employee utilized a scaffold that was not fully planked while performing masonry work on the exterior of the building.
Recent events (2)
- — I (S) $3900
- — Z (S) $6452
1926.451 F03
- Issued
- Sep 13, 2024
- Abate by
- Oct 15, 2024
- Penalty
- Initial $5,531 · Current $3,300 Reduced
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: On or about April 30, 2024, on the west side of building #2; employees utilized a scaffold that was not inspected by a competent person while performing masonry work .
Recent events (2)
- — I (S) $3300
- — Z (S) $5531
1926.451 G01 VII
- Issued
- Sep 13, 2024
- Abate by
- Oct 15, 2024
- Penalty
- Initial $5,531 · Current $3,300 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. On or about April 30, 2024, on west side of building #2; employees utilized a scaffold at heights greater than 10 feet without any fall protection while performing masonry work.
Recent events (2)
- — I (S) $3300
- — Z (S) $5531
1926.451 H02
- Issued
- Sep 13, 2024
- Penalty
- Initial $3,687 · Current $2,200 Reduced
General-duty citation text
29 CFR 1926.451(h)(2): Employees working below a scaffold were not protected from falling tools, materials or equipment in accordance with the provisions of paragraphs (h)(2)(i)-(v) of this section: On or about April 30, 2024, on west side of building #2; employees utilized a scaffold and were not protected from falling tools, materials, or equipment while performing masonry work.
Recent events (2)
- — I (S) $2200
- — Z (S) $3687
1926.454 A
- Issued
- Sep 13, 2024
- Abate by
- Oct 15, 2024
- Penalty
- Initial $2,765 · Current $1,700 Reduced
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. On or about April 30, 2024, on the west side building #2; employees utilized a scaffold without being trained by a qualified person while performing masonry work.
Recent events (2)
- — I (S) $1700
- — Z (S) $2765
More inspections at J & L Plastering
View J & L Plastering's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347453037.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.