OSHA Inspection: JOSE LUIS DE VICENTE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE LUIS DE VICENTE in 565 PINE VALLEY, EL PASO, TX 79928 (NAICS 238190). OSHA activity number 347453243.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Jose Luis DE Vicente — free Get an email when a new federal OSHA severe-injury report for Jose Luis DE Vicente is published. One employer, no account, unsubscribe in one click.
Site address
565 PINE VALLEY
City
EL PASO
State
TX
ZIP
79928
Mailing
501 AGUA DEL RIO, EL PASO, TX 79928
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238190
Employees
11
Ownership type
A

7 citations on file for this inspection.

1903.19 D01

Other-than-serious 6 instances 8 exposed
Issued
Oct 17, 2024
Abate by
Nov 21, 2024
Penalty
Initial $388 · Current $388
29 CFR  1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.  a) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 1 issued on August 26, 2024, with an abatement due date of September 20, 2024.  b) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 2 issued on August 26, 2024, with an abatement due date of September 20, 2024.  c) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 3 issued on August 26, 2024, with an abatement due date of September 20, 2024.  d) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 4 issued on August 26, 2024, with an abatement due date of September 20, 2024.  e) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 1 item 5 issued on August 26, 2024, with an abatement due date of September 20, 2024.  f) On or about October 16, 2024, the employer did not submit documentation and Certification of Corrective Action for citation 2 item 1 issued on August 26, 2024, with an abatement due date of September 20, 2024.
Recent events (1)
  • — Z (O) $388

1926.451 B01

Serious Gravity 5 2 instances 8 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $5,531 · Current $5,531
29 CFR  1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii).  On or about April 30, 2024, on the westside of the residence; employees utilized a  scaffold platforms that were not fully planked while performing plastering work.
Recent events (1)
  • — Z (S) $5531

1926.451 C02

Serious Gravity 5 2 instances 8 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $4,610 · Current $4,610
29 CFR  1926.451(c)(2):Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:  On or about April 30, 2024, on the west side of the residence; employees utilized a tubular scaffold where the legs were not supported on base plates and mud sills while performing plastering work.
Recent events (1)
  • — Z (S) $4610

1926.451 F03

Serious Gravity 10 1 instance 8 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $6,452 · Current $6,452
29 CFR  1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  On or about April 30, 2024, on the west side of the residence; the components on a tubular scaffold used by employees who were performing plastering work were not inspected by a competent person before work shift or occurrence that could affect the integrity of the scaffold's structure.
Recent events (1)
  • — Z (S) $6452

1926.451 G04 XV

Serious Gravity 1 1 instance 8 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $2,765 · Current $2,765
29 CFR  1926.451(g)(4)(xv):Cross bracing used does not met the mid-rail minimal and maximum specification of the crossing point of two braces is between 20 inches (0.5 m) and 30 inches ((0.8 M) above the work platform.   On or above April 30, 2024, on the west side of the residence; employees used a tubular scaffold without a mid-rail at each one of the upright tiers while performing plastering work.
Recent events (1)
  • — Z (S) $2765

1910.1200 G08

Serious Gravity 1 1 instance 2 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $2,765 · Current $2,765
29 CFR  1910.1200(g)(8):  The employer did not ensure that Safety Data Sheets were readily accessible during each work shift to employees when they were in their work area(s).  On or about April 30, 2024, on the front of the residence; the employer did not have safety data sheets readily available for those employees mixing chemicals.
Recent events (1)
  • — Z (S) $2765

1926.451 E01

Other-than-serious 1 instance 8 exposed
Issued
Aug 26, 2024
Abate by
Sep 20, 2024
Penalty
Initial $518 · Current $518
29 CFR  1926.451(e)(1): Scaffold platforms were more than 2 feet (0.6 m) above a point of access, attachable ladders, stair towers (scaffold stairways/towers), integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.    On or about April 30, 2024, on the west side of the residence; employees use a ladder form a tubular scaffold where the height of the lower rung to access was greater than 2 feet from the ground.
Recent events (1)
  • — Z (O) $518

View Jose Luis DE Vicente's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347453243.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.