Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: THE NORTHERN MANUFACTURING COMPANY INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of THE NORTHERN MANUFACTURING COMPANY INC. in 150 N. LAKE WINDS PKWY., OAK HARBOR, OH 43449 (NAICS 332999). OSHA activity number 347534935.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch The Northern Manufacturing Company INC. — free Get an email when a new federal OSHA severe-injury report for The Northern Manufacturing Company INC. is published. One employer, no account, unsubscribe in one click.
Site address
150 N. LAKE WINDS PKWY.
City
OAK HARBOR
State
OH
ZIP
43449
Mailing
150 N. LAKE WINDS PKWY., OAK HARBOR, OH 43449
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332999
Employees
150
Ownership type
A

3 citations on file for this inspection.

1910.184 C13

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 13, 2024
Penalty
Initial $14,518 · Current $7,259 Reduced
29 CFR  1910.184(c)(13): The employer loaded a sling in excess of its recommended safe working load as prescribed by the sling manufacturer on the identification marking permanently affixed to the sling.  a). The Northern Manufacturing Company Inc. on or about June 7, 2024, at the location of 150 N. Lake Winds Pkwy. Oak Harbor, Ohio 43449: The employer did not ensure the 3"x4' polyester round sling used in the Welding Training area to lift a "Rake" was utilized within its listed capacity. Due to this condition, employees in the area were exposed to struck by and crushing hazards.
Recent events (2)
  • — I (S) $7259
  • — Z (S) $14518

1910.184 D

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 13, 2024
Penalty
Initial $14,518 · Current $7,259 Reduced
29 CFR  1910.184(d):Sling(s) and fastenings were not inspected each day or during use and were not removed from service when damaged or defective.  a). The Northern Manufacturing Company Inc. on or about June 7, 2024 at the location of 150 N. Lake Winds Pkwy. Oak Harbor, Ohio 43449: The employer did not ensure polyester slings used to lift metal parts and materials in the Welding Training area with cranes were adequately inspected each day or during use. Due to this condition, employees in the areas where cranes are operated were exposed to struck by, crushing hazards.
Recent events (2)
  • — I (S) $7259
  • — Z (S) $14518

1910.184 I09

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 13, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.184(i)(9): Synthetic web sling was not immediately removed from service for having snags, cuts and tears.  a). The Northern Manufacturing Company Inc. on or about June 7, 2024 at the location of 150 N. Lake Winds Pkwy. Oak Harbor, Ohio 43449: The employer did not ensure polyester slings used to lift metal parts and materials in the Welding Training area with cranes were immediately  removed from service when defects were found. Due to this condition, employees in the areas where cranes are operated were exposed to struck by, crushing hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View The Northern Manufacturing Company INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347534935.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.