OSHA Inspection: ANVIL STUCCO REMEDIATION & RESTORATION INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of ANVIL STUCCO REMEDIATION & RESTORATION INC. in 730 MONTROSE STREET, PHILADELPHIA, PA 19147 (NAICS 238140). OSHA activity number 347577181.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Anvil Stucco Remediation & Restoration INC. — free Get an email when a new federal OSHA severe-injury report for Anvil Stucco Remediation & Restoration INC. is published. One employer, no account, unsubscribe in one click.
Site address
730 MONTROSE STREET
City
PHILADELPHIA
State
PA
ZIP
19147
Mailing
239 BUCKBOARD ROAD, WILLOW GROVE, PA 19090
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
8
Ownership type
A

4 citations on file for this inspection.

1926.451 B03

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 20, 2024
Abate by
Jan 10, 2025
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(b)(3): Except as provided in paragraphs (b)(3)(i) and (ii) of this section, the front edge of all platforms shall not be more than 14 inches (36 cm) from the face of the work, unless guardrail systems are erected along the front edge and/or personal fall arrest systems are used in accordance with paragraph (g) of this section to protect employees from falling:  a) Jobsite: 730 Montrose St, Philadelphia, PA - On or about June 26, 2024, the employer did not ensure that employees conducting siding activities utilizing a pump jack scaffold, approximately 25 feet above the ground level, was within 14 inches of the working surface. Employees were working from a scaffold approximately 17 inches from the working surface, thereby exposing them to fall hazards.
Recent events (2)
  • — I (S) $4839
  • — Z (S) $4839

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 20, 2024
Abate by
Jan 10, 2025
Penalty
Initial $4,839 · Current $0 Reduced
29 CFR  1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  a) Jobsite: 730 Montrose Street, Philadelphia PA - On or about June 26, 2024, the employer did not ensure each employee was protected from falls by the use of personal fall arrest systems or guardrail systems. Employees were conducting masonry activities from a pump jack scaffold without a fall protection system or guardrail system, thereby exposing employees to fall hazards of approximately 25 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4839

1926.451 C02

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 20, 2024
Abate by
Jan 10, 2025
Penalty
Initial $4,839 · Current $4,839
29 CFR  1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation:  a) Jobsite: 730 Montrose St, Philadelphia, PA - On or about June 26, 2024, the employer did not ensure scaffold supports were on base plates and mud sills. Employees were conducting masonry activities on a pump jack scaffold approximately 25 feet from the ground, thereby exposing employees to fall hazards.
Recent events (2)
  • — I (S) $4839
  • — Z (S) $4839

1926.452 J02

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 20, 2024
Abate by
Jan 10, 2025
Penalty
Initial $4,839 · Current $0 Reduced
29 CFR  1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled:  a) Jobsite: 730 Montrose St, Philadelphia, PA - On or about June 26, 2024, the employer did not ensure poles at the bottom of a pump jack scaffold were secured to the structure by rigid triangular bracing. Employees were performing siding activities from an unsecured pump jack scaffold approximately 25 feet from the ground, thereby exposing them to fall hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4839

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347577181.