Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,892Inspections Most recent open 2026-09-03 Last loaded 2026-09-07

OSHA Inspection: SUMMIT ROOFING PA LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SUMMIT ROOFING PA LLC in 1-7 FAIRFIELD LANE, MECHANICSBURG, PA 17050 (NAICS 238160). OSHA activity number 347645954.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Summit Roofing PA LLC for free Get an email when a new federal OSHA severe-injury report for Summit Roofing PA LLC is published. One employer, no account, unsubscribe in one click.
Site address
1-7 FAIRFIELD LANE
City
MECHANICSBURG
State
PA
ZIP
17050
Mailing
545 LAMP POST LANE, CAMP HILL, PA 17011
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
Private (A)

1 citation on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 5, 2024
Abate by
Aug 19, 2024
Penalty
Initial $4,839 · Current $4,839
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a. Roof - On or about July 26, 2024, employees were engaged in reroofing work on a series of two-story connected townhouses without fall protection. The employees were exposed to a fall hazard of approximately 20 feet.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • · Z (S) $4839

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 347645954.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.