OSHA Inspection: PROPER STORAGE SYSTEMS, LLC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of PROPER STORAGE SYSTEMS, LLC in 2200 EAST U.S. HIGHWAY 90, SEGUIN, TX 78155 (NAICS 337215). OSHA activity number 347688103.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Proper Storage Systems, LLC — free Get an email when a new federal OSHA severe-injury report for Proper Storage Systems, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2200 EAST U.S. HIGHWAY 90
City
SEGUIN
State
TX
ZIP
78155
Mailing
2200 EAST U.S. HIGHWAY 90, SEGUIN, TX 78155
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
337215
Employees
9
Ownership type
A

5 citations on file for this inspection.

1910.107 B05 I

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 27, 2024
Abate by
Oct 24, 2024
Penalty
Initial $4,148 · Current $2,489 Reduced
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained.  On or about August 14, 2024, and at times prior thereto, the facility paint spray booth had an inoperable and paint coated manometer, preventing visibility of booth air speed.
Recent events (2)
  • — I (S) $2488.8
  • — Z (S) $4148

1910.107 B05 IV

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 27, 2024
Abate by
Oct 24, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.107(b)(5)(iv): Space within the spray booth on the downstream and upstream sides of filters were not protected with approved automatic sprinklers:   On or about August 14, 2024, and at times prior thereto, the facility paint spray booth where employees applied Direct to Metal Alkyd Enamel Ultradeep Base flammable paint through spray application means was not protected with sprinklers.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.107 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 27, 2024
Abate by
Oct 24, 2024
Penalty
Initial $4,148 · Current $2,489 Reduced
29 CFR 1910.107(g)(1): Spraying was conducted outside of predetermined spraying area(s):   On or about August 14, 2024, and at times prior thereto, employees conducted spraying finishing of flammable and hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint, outside the paint spray booth on a regular basis.
Recent events (2)
  • — I (S) $2488.8
  • — Z (S) $4148

1910.134 C01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 27, 2024
Abate by
Oct 24, 2024
Penalty
Initial $4,148 · Current $2,489 Reduced
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use:    On or about August 14, 2024, and at times prior thereto, the employer had not developed a written respiratory protection program for employees conducting spray finishing with flammable and hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint, and were required to wear a respirator.
Recent events (2)
  • — I (S) $2488.8
  • — Z (S) $4148

1910.1200 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 27, 2024
Abate by
Oct 24, 2024
Penalty
Initial $4,148 · Current $2,489 Reduced

Hazardous substances 2590

29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program that included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):   On or about August 14, 2024, and at times prior thereto, the employer had not developed a written hazard communication program for employees conducting spray finishing of chemically hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint.
Recent events (2)
  • — I (S) $2488.8
  • — Z (S) $4148