SEGUIN, TX —
OSHA Inspection: PROPER STORAGE SYSTEMS, LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PROPER STORAGE SYSTEMS, LLC in 2200 EAST U.S. HIGHWAY 90, SEGUIN, TX 78155 (NAICS 337215). OSHA activity number 347688103.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PROPER STORAGE SYSTEMS, LLC
- Site address
- 2200 EAST U.S. HIGHWAY 90
- City
- SEGUIN
- State
- TX
- ZIP
- 78155
- Mailing
- 2200 EAST U.S. HIGHWAY 90, SEGUIN, TX 78155
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337215
- Employees
- 9
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.107 B05 I
- Issued
- Sep 27, 2024
- Abate by
- Oct 24, 2024
- Penalty
- Initial $4,148 · Current $2,489 Reduced
General-duty citation text
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained. On or about August 14, 2024, and at times prior thereto, the facility paint spray booth had an inoperable and paint coated manometer, preventing visibility of booth air speed.
Recent events (2)
- — I (S) $2488.8
- — Z (S) $4148
1910.107 B05 IV
- Issued
- Sep 27, 2024
- Abate by
- Oct 24, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.107(b)(5)(iv): Space within the spray booth on the downstream and upstream sides of filters were not protected with approved automatic sprinklers: On or about August 14, 2024, and at times prior thereto, the facility paint spray booth where employees applied Direct to Metal Alkyd Enamel Ultradeep Base flammable paint through spray application means was not protected with sprinklers.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.107 G01
- Issued
- Sep 27, 2024
- Abate by
- Oct 24, 2024
- Penalty
- Initial $4,148 · Current $2,489 Reduced
General-duty citation text
29 CFR 1910.107(g)(1): Spraying was conducted outside of predetermined spraying area(s): On or about August 14, 2024, and at times prior thereto, employees conducted spraying finishing of flammable and hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint, outside the paint spray booth on a regular basis.
Recent events (2)
- — I (S) $2488.8
- — Z (S) $4148
1910.134 C01
- Issued
- Sep 27, 2024
- Abate by
- Oct 24, 2024
- Penalty
- Initial $4,148 · Current $2,489 Reduced
General-duty citation text
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: On or about August 14, 2024, and at times prior thereto, the employer had not developed a written respiratory protection program for employees conducting spray finishing with flammable and hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint, and were required to wear a respirator.
Recent events (2)
- — I (S) $2488.8
- — Z (S) $4148
1910.1200 E01
- Issued
- Sep 27, 2024
- Abate by
- Oct 24, 2024
- Penalty
- Initial $4,148 · Current $2,489 Reduced
2590
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program that included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): On or about August 14, 2024, and at times prior thereto, the employer had not developed a written hazard communication program for employees conducting spray finishing of chemically hazardous materials, such as Direct to Metal Alkyd Enamel Ultradeep Base Paint.
Recent events (2)
- — I (S) $2488.8
- — Z (S) $4148
More inspections in this industry (NAICS 337215)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347688103.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.