WARWICK, RI —
OSHA Inspection: SUMMIT MEDICAL COMPASSION CENTER, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of SUMMIT MEDICAL COMPASSION CENTER, INC. in 66 ILLINOIS AVENUE, WARWICK, RI 02888 (NAICS 325411). OSHA activity number 347714156.
Where did this inspection happen?
- Establishment
- SUMMIT MEDICAL COMPASSION CENTER, INC.
- Site address
- 66 ILLINOIS AVENUE
- City
- WARWICK
- State
- RI
- ZIP
- 02888
- Mailing
- 66 ILLINOIS AVENUE, WARWICK, RI 02888
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325411
- Employees
- 39
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.36 B01
- Issued
- Abate by
- Penalty
- Initial $11585.00 · Current $8110.00 Reduced
General-duty citation text
29 CFR 1910.36(b)(1): At least two exit routes were not available in the workplace to permit prompt evacuation of employees and other building occupants during an emergency, except as allowed in paragraph (b)(3) of this section. The exit routes must be located as far away as practical from each other so that if one exit route is blocked by fire or smoke, employees can evacuate using the second exit route. (a) Extraction Laboratory: On or about August 26, 2024, the employer did not provide two means of emergency egress in a high hazard, high occupancy work area to allow for the safe exiting of employees in the event of an emergency.
Recent events (2)
- — I (S) $8109.5
- — Z (S) $11585
1910.305 G01 IV A
- Issued
- Abate by
- Penalty
- Initial $8441.00 · Current $5909.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure. (a) Extraction Laboratory: On or about August 26, 2024, employees were exposed to the electrical hazard of a flexible extension cord used as a substitute for the fixed wiring of a structure: 1) Above the ceiling in the main room and used to supply power to a power strip powering various equipment on the lab bench. 2) In the extraction room and used to supply power to the Apeks controller unit.
Recent events (2)
- — I (S) $5908.7
- — Z (S) $8441
1910.305 G01 IV B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors. (a) Extraction Laboratory: On or about August 26, 2024, employees were exposed to the electrical hazard of a flexible extension cord that was run through a hole in the ceiling in the main room and used to supply power to a power strip energizing various equipment on the lab bench.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.132 D02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.132(d)(2): The employer did not verify that the required workplace hazard assessment has been performed through a written certification which included the requirements as outlined in 29 CFR 1910.132(d)(2). (a) Extraction Laboratory: On or about August 26, 2024, the employer did not verify that the required workplace hazard assessment had been performed through a written certification that identifies the workplace evaluated, the person certifying that the evaluation has been performed, and the date(s) of the hazard assessment. Abatement Note: Once the PPE Hazard Assessment is completed you shall: Certify that the hazard assessment has been performed through a written certification in accordance with 1910.132(d)(2), which includes: 1) Identification of the workplace evaluated, 2) The person certifying the evaluation, 3) The date the evaluation was conducted. Guidance on conducting and documenting a PPE Hazard Assessment can be found on OSHA's website at: https://www.osha.gov/personal-protective-equipment
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.307 B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.307(b): Areas designated as hazardous (classified) locations under the Class and Zone system and areas designated under the Class and Division system established after August 13, 2007, were not properly documented. (a) Extraction Laboratory: On or about August 26, 2024, the employer had not properly documented the locations, including the Extraction Laboratory area where flammable liquids including ethanol were used in the extraction process under the Class and Zone system.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at SUMMIT MEDICAL COMPASSION CENTER, INC.
WARWICK, RI—2025-01-15
SUMMIT MEDICAL COMPASSION CENTER, INC.
WARWICK, RI—2025-01-14
SUMMIT MEDICAL COMPASSION CENTER, INC.
View SUMMIT MEDICAL COMPASSION CENTER, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 325411)
VASSAR, MI—2026-07-14
VASSER WELLNESS AND VITALITY LLC DBA MUHA MEDS
BARCELONETA, PR—2026-07-02
PUERTO RICO ALCHEMY LLC
EDMORE, MI—2026-06-04
BLAZE PROCESSING
NEW BERLIN, WI—2026-06-03
DREAMPAK, LLC
REDMOND, OR—2026-05-27
317744311 - OREGON'S WILD HARVEST INC
More inspections in RI
PAWTUCKET, RI—2026-07-16
INTERNATIONAL PACKAGING CORPORATION
WARWICK, RI—2026-07-16
LYON PROPERTY MANAGEMENT, LLC
LINCOLN, RI—2026-07-14
TFORCE FREIGHT
JOHNSTON, RI—2026-07-14
WEST BAY RESIDENTIAL SERVICES INC.
NEWPORT, RI—2026-07-10
STEVEN POSTHUMA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347714156.