OSHA Inspection: ORCHARD HOLLOW CONSTRUCTION, LLC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of ORCHARD HOLLOW CONSTRUCTION, LLC in 971 NORTH COLEBROOK ROAD, MANHEIM, PA 17545 (NAICS 238110). OSHA activity number 347751042.

Watch Orchard Hollow Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Orchard Hollow Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
971 NORTH COLEBROOK ROAD
City
MANHEIM
State
PA
ZIP
17545
Mailing
790 HOSSLER ROAD, MANHEIM, PA 17545
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238110
Employees
5
Ownership type
A

4 citations on file for this inspection.

1926.453 B02 V

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3457.00 · Current $3457.00
29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift:  a) Worksite, 971 North Colebrook Road Manheim, PA - On or about September 12, 2024, employees worked inside an elevated Genie Model# S-60X Articulating Boom Lift basket at a height of approximately 20 feet above grade without fall protection.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $3457

1926.454 A

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.  a) Worksite, 971 North Colebrook Road Manheim, PA - On or about September 12, 2024, each employee who worked inside an elevated Genie Model# S-60X Articulating Boom Lift basket did not receive training in appropriate fall protection methods to avoid fall hazards associated with the work.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.501 B11

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $4839.00 · Current $4839.00
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems:  a) Worksite, 971 North Colebrook Road Manheim, PA - On or about September 12, 2024, employees performed roofing activities on a commercial structure with a 5:12 roof pitch without fall protection and were exposed to fall hazards up to approximately 34 feet to the grade below.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $4839

1926.503 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  a) Worksite, 971 North Colebrook Road Manheim, PA - On or about September 12, 2024, employees installed a new roof on a 300 ft x 70 ft 5/12 pitch commercial structure at heights between 20 ft and 34 ft and were not trained in appropriate fall protection methods to avoid hazards associated with elevated work areas.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347751042.