Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ARMANDO VELASQUEZ DBA ARMANDO VELASQUEZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARMANDO VELASQUEZ DBA ARMANDO VELASQUEZ in 2900 N. MANNHEIM ROAD, FRANKLIN PARK, IL 60131 (NAICS 238140). OSHA activity number 347822066.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Armando Velasquez DBA Armando Velasquez — free Get an email when a new federal OSHA severe-injury report for Armando Velasquez DBA Armando Velasquez is published. One employer, no account, unsubscribe in one click.
Site address
2900 N. MANNHEIM ROAD
City
FRANKLIN PARK
State
IL
ZIP
60131
Mailing
3218 S 49TH AVE, CICERO, IL 60804
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

5 citations on file for this inspection.

1910.178 L01 I

Serious Gravity 10 1 instance 2 exposed
Issued
Feb 6, 2025
Abate by
Mar 5, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR 1926.602(d):  The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l):  29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):  a) On or about October 16, 2024, the employer provided employees with a JCB 508-66TC Telehandler without ensuring they were competent to operate the equipment safely, as demonstrated by successful completion of forklift training and evaluation.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • — A (S) $4965
  • — I (S) $3600
  • — Z (S) $4965

1926.20 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 6, 2025
Abate by
Mar 5, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.20(b)(1): The employer did not initiate or maintain an accident prevention program(s) as may be necessary to comply with this part:   a) On or about October 16, 2024, the employer did not maintain programs to provide for compliance with the OSH Act to control or minimize the safety and health hazards associated with work that his employees are required to perform.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 A06

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 6, 2025
Abate by
Mar 5, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR 1926.451(a)(6): Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design:  a) On October 16, 2024, employees were preforming work from a modified Star Industries 1208C/G Safety Work Platform which was not designed and constructed by a qualified person.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • — A (S) $4965
  • — I (S) $0
  • — Z (S) $4965

1926.451 C02 IV

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 6, 2025
Abate by
Mar 5, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2)(iv): Front-end loaders and similar pieces of equipment were used to support scaffold platforms when they were not specifically designed by the manufacturer for such use:  a) On October 16, 2024, employees were exposed to fall hazards while performing work from a modified work platform supported by a JCB 508-66TC Telehandler which was not designed by the manufacturer for such use.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 6, 2025
Abate by
Mar 5, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR  1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level.   a) On October 16, 2024, employees were exposed to fall hazards while using Star Industries 1208C/G Safety Work Platform without the use of fall protection.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • — A (S) $4965
  • — I (S) $3600
  • — Z (S) $4965

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347822066.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.