DEERFIELD, IL —
OSHA Inspection: ANTONIO GONZALEZ DBA ANTONIO GONZALEZ
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ANTONIO GONZALEZ DBA ANTONIO GONZALEZ in 1424 ARBOR VITAE RD., DEERFIELD, IL 60015 (NAICS 238160). OSHA activity number 347852766.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ANTONIO GONZALEZ DBA ANTONIO GONZALEZ
- Site address
- 1424 ARBOR VITAE RD.
- City
- DEERFIELD
- State
- IL
- ZIP
- 60015
- Mailing
- 1304 W. 72ND PL.,, CHICAGO, IL 60636
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 3
- Ownership type
- A
Citations
6 citations on file for this inspection.
1903.19 C01
- Issued
- Apr 16, 2025
- Abate by
- Jun 3, 2025
- Penalty
- Initial $398 · Current $398
General-duty citation text
29 CFR 1903.19(c)(1):29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Antonio Gonzalez dba Antonio Gonzalez., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item number Abatement Date 01 02 02-28-2025 01 03 02-28-2025 01 04 02-28-2025 01 05 02-28-2025 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (O) $398
1926.102 A01
- Issued
- Feb 3, 2025
- Penalty
- Initial $2,837 · Current $2,837
General-duty citation text
29 CFR 1926.102(a)(1):The employer did not ensure that each affected employee use appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors or potentially injurious light radiation. a) On or about October 30, 2024 at the above-mentioned address, employees were exposed to eye injury while operating pneumatic nail guns without the benefit of eye protection. No abatement certification or documentation is required for this item.
Recent events (1)
- — Z (S) $2837
1926.416 A01
- Issued
- Feb 3, 2025
- Abate by
- Feb 28, 2025
- Penalty
- Initial $4,965 · Current $4,965
General-duty citation text
29 CFR 1926.416(a)(1):Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On or about October 30, 2024, at the above-mentioned address, employees performing roofing work were exposed to electrical hazards while working in close proximity to a live 120/240 volt power line. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4965
1926.416 E01
- Issued
- Feb 3, 2025
- Abate by
- Feb 28, 2025
- Penalty
- Initial $2,837 · Current $2,837
General-duty citation text
29 CFR 1926.416(e)(1):Worn or frayed electric cords or cables shall not be used. a) On or about October 30, 2024 at the above-mentioned address, extension cords that were used by employees to power hand tools had been damaged and lacked insulation. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2837
1926.451 G01
- Issued
- Feb 3, 2025
- Abate by
- Feb 28, 2025
- Penalty
- Initial $4,965 · Current $4,965
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. a) On or about October 30, 2024, at the above-mentioned address employees conducting roofing work were exposed to fall hazards while working on a scaffold 10.3 feet above the ground without fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4965
1926.501 B13
- Issued
- Feb 3, 2025
- Abate by
- Feb 28, 2025
- Penalty
- Initial $4,256 · Current $4,256
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor were the employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) On or about October 30, 2024, at the above mentioned address, employees were exposed to fall hazards of approximately 8.7 feet ground to eave while performing residential roofing work. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4256
More inspections at Antonio Gonzalez DBA Antonio Gonzalez
View Antonio Gonzalez DBA Antonio Gonzalez's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347852766.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.