Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: BUCK HILL CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BUCK HILL CONSTRUCTION, LLC in 2 WEST MAIN STREET, HUMMELSTOWN, PA 17036 (NAICS 238130). OSHA activity number 347864969.

Watch Buck Hill Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Buck Hill Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2 WEST MAIN STREET
City
HUMMELSTOWN
State
PA
ZIP
17036
Mailing
1166 DRAGER ROAD, COLUMBIA, PA 17512
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238130
Employees
2
Ownership type
A

4 citations on file for this inspection.

1926.501 B13

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $4148.00 · Current $4148.00
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a. The Roof - On or about November 6, 2024, employees were framing the roof of an expansion of the existing structure. The employees working at heights greater than 6 feet were not utilizing a means fall protection, such as but not limited to personal fall arrest, guard rails, or nets.   Corrected During Inspection
Recent events (1)
  • — Z (S) $4148

1926.1051 A

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $2765.00 · Current $2765.00
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided:   a. The Roof - On or about November 6, 2024, employees were framing the roof of an expansion of the existing structure. The employees did not have a safe means of access and egress as they had been using a forklift that was not always in the raised position and did not have fall protection to safely and reliably constitute safe access and egress or a means as prescribed by this standard.  Corrected During Inspection
Recent events (1)
  • — Z (S) $2765

1926.503 A01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   a. The Roof - On or about November 6, 2024, employees were framing the roof of an expansion of the existing structure. The employees working at heights greater than 6 feet were not trained to recognize and mitigate fall hazards at the jobsite.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

1926.503 B01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer.     a. The Roof - On or about November 6, 2024, employees were framing the roof of an expansion of the existing structure. The employees working at heights greater than 6 feet that had been trained on fall hazards were not documented through written certification.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347864969.