SPRINGFIELD, MA —
OSHA Inspection: TITEFLEX COMMERCIAL INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TITEFLEX COMMERCIAL INC. in 603 HENDEE STREET, SPRINGFIELD, MA 01104 (NAICS 332999). OSHA activity number 347867335.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TITEFLEX COMMERCIAL INC.
- Site address
- 603 HENDEE STREET
- City
- SPRINGFIELD
- State
- MA
- ZIP
- 01104
- Mailing
- 603 HENDEE STREET, SPRINGFIELD, MA 01104
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- Employees
- 130
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C04 II C
- Issued
- Dec 5, 2024
- Abate by
- Mar 17, 2025
- Penalty
- Initial $14,518 · Current $14,518
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(C): The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them: 603 Hendee Street, Springfield, MA: On and before November 7, 2024, some energy control procedures (ECP) did not include specific procedural steps for the placing of lockout devices required for energy control. The Kopex Oven ECP natural gas energy source stated to close valve, apply lockout device, and apply lock. However, the valve to close the gas flow had no lever and the type of device to use to lock out was not stipulated. Also, the Extruder ECP air energy source for the take up section stated to shut valve and apply lock, but the valve was not lockable and a specific device was not stipulated.
Recent events (2)
- — P (S) $14518
- — Z (S) $14518
1910.147 C04 II D
- Issued
- Dec 5, 2024
- Abate by
- Mar 17, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures: 603 Hendee Street, Springfield, MA: On and before November 7, 2024, the verification steps in the energy control procedures (ECP) were not sufficient as they only included a generic statement to start the machine. The Extruder ECP air energy source for the take up section stated to bleed off residual air pressure, but there were no details as how to do that or to verify the isolation/bleed off. Also, there were no specific steps on how to verify the isolation of the natural gas energy source for the Kopex Oven ECP.
Recent events (2)
- — P (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Dec 5, 2024
- Abate by
- Mar 17, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 603 Hendee Street, Springfield, MA: On and for more than two years before November 7, 2024, the employer had not performed a comprehensive periodic inspection of energy control procedures for all multi-energy sources machines, including the Kopex Oven machine, at least annually, to verify that each procedure was adequate and being properly used by employees. *Abatement Notes: A periodic inspection shall include the following elements: - Appointment of an authorized employee to inspect each local procedure for inaccuracies during an energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (2)
- — P (S) $0
- — Z (S) $0
More inspections at Titeflex Commercial INC.
View Titeflex Commercial INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347867335.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.