OSHA Inspection: J&C HOME RENOVATIONS INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of J&C HOME RENOVATIONS INC. in 1115 MAIN ST., FISHKILL, NY 12524 (NAICS 236118). OSHA activity number 347889073.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J&C Home Renovations INC. — free Get an email when a new federal OSHA severe-injury report for J&C Home Renovations INC. is published. One employer, no account, unsubscribe in one click.
Site address
1115 MAIN ST.
City
FISHKILL
State
NY
ZIP
12524
Mailing
100 OTTERKILL RD., NEW WINDSOR, NY 12553
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
236118
Employees
3
Ownership type
A

6 citations on file for this inspection.

1926.451 A06

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 19, 2024
Penalty
Initial $3,457 · Current $2,074 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, the employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were performing brick work on the fourth tier of the first section of a tubular welded frame scaffold. The working level had two wood planks approximately 18 inches wide. The working level was not fully planked.  the employees were exposed to falling approximately 28-feet to the ground.
Recent events (2)
  • — I (S) $2074.2
  • — Z (S) $3457

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 19, 2024
Penalty
Initial $3,457 · Current $2,074 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, the employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were performing brick work on the fourth tier of the first section of a tubular welded frame scaffold. The working level had two wood planks approximately 18 inches wide. The working level was not fully planked.  the employees were exposed to falling approximately 28-feet to the ground.
Recent events (2)
  • — I (S) $2074.2
  • — Z (S) $3457

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 19, 2024
Penalty
Initial $3,457 · Current $2,074 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access:  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building  - On or about November 19, 2024, employees were accessing  the fourth level of the  tubular welded frame scaffold approximately 28-feet above by climbing the walk through frames and crossbraces. employees were not provided with  access to the scaffold platforms.
Recent events (2)
  • — I (S) $2074.2
  • — Z (S) $3457

1926.451 G01

Serious Gravity 5 2 instances 2 exposed
Issued
Dec 19, 2024
Penalty
Initial $3,457 · Current $2,074 Reduced
29 CFR  1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, an employee performing brick work on the fourth tier of the first section of a tubular welded frame scaffold approximately 28-feet above the ground and was not provided with any means of fall protection.  b) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, employees performing brick work on the fourth tier of the third section of a  tubular welded frame scaffold, were not provided with adequate fall protection. The employees were exposed to a fall of up to 28 feet above the ground.
Recent events (2)
  • — I (S) $2074.2
  • — Z (S) $3457

1926.451 F03

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 19, 2024
Penalty
Initial $3,457 · Current $2,074 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, employees were performing brick work from the fourth tier of a tubular welded frame scaffold that had not been inspected by a competent person.
Recent events (2)
  • — I (S) $2074.2
  • — Z (S) $3457

1926.454 A

Serious Gravity 5 2 instances 2 exposed
Issued
Dec 19, 2024
Abate by
Jan 24, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.  a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building:  On or about November 19, 2024, employees were performing brick work from the fourth tier of a tubular welded frame scaffold and were not trained by a qualified person.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0