BINGHAMTON, NY —
OSHA Inspection: ECK PLASTIC HOLDINGS, LLC
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of ECK PLASTIC HOLDINGS, LLC in 87 PROSPECT AVENUE, BINGHAMTON, NY 13901 (NAICS 326199). OSHA activity number 347912750.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ECK PLASTIC HOLDINGS, LLC
- Site address
- 87 PROSPECT AVENUE
- City
- BINGHAMTON
- State
- NY
- ZIP
- 13901
- Mailing
- 87 PROSPECT AVENUE, BINGHAMTON, NY 13901
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 20
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C04 II
- Issued
- Apr 16, 2025
- Penalty
- Initial $2,837 · Current $2,128 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The lockout/tagout procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy: a) Eck Plastic Holdings, LLC dba Eck Plastic Arts, 87 Prospect Avenue, Binghamton, New York, 13901, Fabrication. On or about 11/04/2024, the employer did not include gravitational and hydraulic hazardous energy on the lockout/tagout procedure for the Accurpress Press Brake, Model 7608, Serial Number 6602.
Recent events (2)
- — I (S) $2127.75
- — Z (S) $2837
1910.147 C06 I
- Issued
- Apr 16, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Eck Plastic Holdings, LLC dba Eck Plastic Arts, 87 Prospect Avenue, Binghamton, New York, 13901, Fabrication. On or about 12/04/2024, the employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed on the Accurpress Press Brake, Model 7608, Serial Number 6602. b) Eck Plastic Holdings, LLC dba Eck Plastic Arts, 87 Prospect Avenue, Binghamton, New York, 13901, Molding. On or about 12/04/2024, the employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed on the Milacron Plastic Injection Mold Machine, Model MT9-90, Serial Number TB301DB010028.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at ECK Plastic Holdings, LLC
View ECK Plastic Holdings, LLC's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347912750.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.