Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: IMPACT IRON, LLC

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of IMPACT IRON, LLC in 7500 W. ROOSEVELT ROAD, FOREST PARK, IL 60130 (NAICS 238120). OSHA activity number 348048687.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Impact Iron, LLC — free Get an email when a new federal OSHA severe-injury report for Impact Iron, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
IMPACT IRON, LLC
Site address
7500 W. ROOSEVELT ROAD
City
FOREST PARK
State
IL
ZIP
60130
Mailing
822 N. KENNICOTT AVE, ARLINGTON HEIGHTS, IL 60004
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
7
Ownership type
A

6 citations on file for this inspection.

1926.62 D01 I

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $4,965 · Current $3,476 Reduced
29 CFR 1926.62(d)(1)(i): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 �?g/m3) calculated as an 8-hour time-weighted average (TWA):  a) On or about January 27, 2025, at the above addressed jobsite, employees were welding on cross beams/channels coated with lead-based paint above the loading dock doors located on in the warehouse, were exposed to lead-based paint.  The employer did not collect personal samples to determine employee's exposure to lead.
Recent events (2)
  • — I (S) $3475.5
  • — Z (S) $4965

1926.62 D01 III

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level:  a) On or about January 27, 2025, at the above addressed jobsite, employees were welding on beams and channels coated with lead-based paint. The employer did not collect personal samples to determine employee(s) exposure to lead, thereby exposing employees to lead hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.62 D02 V C

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.62(d)(2)(v)(C): The employer did not provide to employees performing the tasks described in paragraphs (d)(2)(i), (d)(2)(ii), (d)(2)(iii) and (d)(2)(iv) of this section interim protection such as change areas in accordance with paragraph (i)(2) of this section:   a) On or about January 27, 2025, at the above addressed jobsite, employees were welding on beams and channels coated with lead-based paint.  The employer did not provide appropriate change areas, thereby exposing employees to lead hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.62 D02 V E

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels:  a) On or about January 27, 2025, at the above addressed jobsite, employees were welding on beams and channels coated with lead-based paint.  The employer did not collect personal samples to determine employee's exposure to lead.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.62 I02 I

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.62(i)(2)(i): The employer did not provide clean change areas as an interim protection for employees performing tasks as specified in 29 CFR 1926.62(d)(2), without regard to the use of respirators:  a) On or about January 27, 2025, at the above addressed jobsite, employees were welding beams and channels coated with lead-based paint.  Employees were not provided with appropriate change areas due to lead contaminated tools and equipment, thereby exposing employees to lead hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.62 J01 I

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 16, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.62(j)(1)(i): The employer did not make available initial medical surveillance, consisting of biological monitoring in the form of blood sampling and analysis for lead and zinc protoporphyrin levels, to employees occupationally exposed on any day to lead at or above the action level:  a) On or about January 27, 2025, at the above addressed jobsite, employees were welding on beams and channels coated with lead-based paint.  The employer did not collect personal samples to determine employee's exposure to lead.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348048687.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.