Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MIRANDA'S CONSTRUCTION & DEVELOPMENT CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MIRANDA'S CONSTRUCTION & DEVELOPMENT CORP. in 2008 ADDISON ST., CHICAGO, IL 60618 (NAICS 238140). OSHA activity number 348090176.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Miranda'S Construction & Development Corp. — free Get an email when a new federal OSHA severe-injury report for Miranda'S Construction & Development Corp. is published. One employer, no account, unsubscribe in one click.
Site address
2008 ADDISON ST.
City
CHICAGO
State
IL
ZIP
60618
Mailing
6324 W ROSCOE ST, CHICAGO, IL 60634
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Jun 10, 2025
Abate by
Jul 29, 2025
Penalty
Initial $398 · Current $398
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:   MIRANDA'S CONSTRUCTION & DEVELOPMENT CORP., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date  01                                01                                   04/25/2025  01                                02                                   04/25/2025  01                                03a                                   04/25/2025  01                                03b                                  04/25/2025  01                                04                                   04/25/2025   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $398

1926.451 B01

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 2, 2025
Abate by
Apr 21, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR  1926.451(b)(1):  Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports:  a)  On or about March 3, 2025, employees were performing masonry work from the east two-point suspension scaffold which was not fully decked or planked.   b)  On or about March 3, 2025, employees were performing masonry work from the south two-point suspension scaffold which was not fully decked or planked.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4965

1926.451 D05 II

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 2, 2025
Abate by
Apr 21, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR 1926.451(d)(5)(ii): Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices were not supported by bearing blocks;  a)  On or about March 3, 2025, employees were performing masonry work from the east two-point suspension scaffold where the right and left cornice hooks were not supported by bearing blocks.   b)  On or about March 3, 2025, employees were performing masonry work from the south two-point suspension scaffold where the right and left cornice hooks were not supported by bearing blocks.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4965

1926.451 D16

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 2, 2025
Abate by
Apr 21, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR  1926.451(d)(16):  Suspension scaffold power-operated hoists or manually operated hoists did not have a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated over-speed:    a)  On or about March 3, 2025, employees were performing masonry work on the east side of the building from a two-point suspension scaffold which did not have a braking device or locking pawl.  b) On or about March 3, 2025,employees were performing masonry work on the south side of the building from a two-point suspension scaffold which did not have a braking device or locking pawl.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4965

1926.451 D17

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 2, 2025
Abate by
Apr 21, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.451(d)(17):  Manually operated hoists did not have a positive crank force to descend:    a)  On or about March 3, 2025, employees were performing masonry work on the east side of the building from a  two-point suspension scaffold where the manually operated hoist did not have a positive crank force to descend  b)  On or about March 3, 2025,  employees were performing masonry work on the south side of the building from a two-point suspension scaffold where the manually operated hoist did not have a positive crank force to descend.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G01 II

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 2, 2025
Abate by
Apr 21, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system:  a)  On or about March 3, 2025, employees performing masonry work from two-point suspension scaffolds were not protected by a personal fall arrest system.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4965

View Miranda'S Construction & Development Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348090176.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.