OSHA Inspection: ECI CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ECI CONSTRUCTION, LLC in 1 REGIONAL WAY, MANCHESTER, PA 17345 (NAICS 236220). OSHA activity number 348093840.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ECI Construction, LLC — free Get an email when a new federal OSHA severe-injury report for ECI Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1 REGIONAL WAY
City
MANCHESTER
State
PA
ZIP
17345
Mailing
124 WEST CHURCH STREET P.O. BOX 459, DILLSBURG, PA 17019
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
236220
Employees
4
Ownership type
A

3 citations on file for this inspection.

1926.50 G

Serious Gravity 1 2 instances 10 exposed
Issued
May 29, 2025
Abate by
Jun 12, 2025
Penalty
Initial $6,384 · Current $6,384
29 CFR 1926.50(g): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:  a. Mixing Area - On or about March 10, 2025, subcontractors from KLB Masonry were mixing mortar which included Portland Cement without access to eyewash facilities, employees were exposed to corrosive hazards.  b. Scaffolding -  On or about March 10, 2025, subcontractors from KLB Masonry were using mortar which included Portland Cement without access to eyewash facilities, employees were exposed to corrosive hazards.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $6384
  • — Z (S) $6384

1926.51 F01

Serious Gravity 1 2 instances 10 exposed
Issued
May 29, 2025
Abate by
Jun 12, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.51(f)(1): The employer did not provide adequate washing facilities for employees engaged in the application of paints, coating, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities shall be in near proximity on the worksite and shall be so equipped as to enable employees to remove such substances:   a. Mixing Area - On or about March 10, 2025, subcontractors from KLB Masonry were mixing mortar which included Portland Cement without access to adequate washing facilities to include clean dry clean towels and neutral pH soap for cleaning skin contact contamination.  b. Scaffolding -  On or about March 10, 2025, subcontractors from KLB Masonry were using mortar which included Portland Cement without access to washing facilities to include clean potable water, dry clean towels and neutral pH soap for cleaning skin contact contamination.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1926.405 A02 II I

Serious Gravity 5 1 instance 4 exposed
Issued
May 29, 2025
Penalty
Initial $8,511 · Current $8,511
29 CFR  1926.405(a)(2)(ii)(I):Protection was not provided to avoid damage to flexible cords and cables used for temporary wiring which passed through doorways or other pinch points:  a. Job Trailer - On or about March 10, 2025, an extension cord used for keeping the MHE engines warm was routed through the doorway, pinched between the door and the frame exposing employees to electrical hazards.   Corrected During Inspection
Recent events (2)
  • — C (S) $8511
  • — Z (S) $8511

View ECI Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348093840.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.