Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RENIV CO.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RENIV CO. in 1137 W GEORGE ST., CHICAGO, IL 60657 (NAICS 238140). OSHA activity number 348121914.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Reniv CO. — free Get an email when a new federal OSHA severe-injury report for Reniv CO. is published. One employer, no account, unsubscribe in one click.
Establishment
RENIV CO.
Site address
1137 W GEORGE ST.
City
CHICAGO
State
IL
ZIP
60657
Mailing
190 S WOOD DALE RD. APT 807, WOOD DALE, IL 60191
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

3 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Apr 4, 2025
Abate by
Apr 23, 2025
Penalty
Initial $4,965 · Current $4,965
29 CFR  1926.451(b)(1):  Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports:  a) On or about March 20, 2025, employees were working from the west tubular welded framed scaffold which was not fully decked or planked.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $4965
  • — Z (S) $4965

1926.451 G01

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 4, 2025
Penalty
Initial $4,965 · Current $0 Reduced
29 CFR  1926.451(g)(1):  Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level.   a) On March 20, 2025, employees working from tubular welded framed scaffold on the north side of the structure were exposed to the hazard of falling approximately 19.6 feet to the concrete below.  a) On March 20, 2025, employees working from tubular welded framed on the west side of the structure were exposed to the hazard of falling approximately 19.6 feet to the concrete below.  No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4965

1926.451 G04 III

Serious Gravity 10 1 instance 1 exposed
Issued
Apr 4, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.451(g)(4)(iii): Midrails, screens, mesh or equivalent structural members were not installed between the top edge of the guardrail system and the scaffold platform:  a)  On March 20, 2025, employees were working from a tubular welded framed scaffold without the midrail installed between the top edge of the guardrail system and the scaffold platform.   No abatement certification or documentation is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348121914.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.