NEW CASTLE, PA —
OSHA Inspection: FLOWLINE DIVISON-EZEFLOW USA INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of FLOWLINE DIVISON-EZEFLOW USA INC. in 1400 NEW BUTLER ROAD, NEW CASTLE, PA 16101 (NAICS 331210). OSHA activity number 348156209.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FLOWLINE DIVISON-EZEFLOW USA INC.
- Site address
- 1400 NEW BUTLER ROAD
- City
- NEW CASTLE
- State
- PA
- ZIP
- 16101
- Mailing
- 1400 NEW BUTLER ROAD, NEW CASTLE, PA 16101
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 331210
- Employees
- 85
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.101 B
- Issued
- Apr 24, 2025
- Penalty
- Initial $4,783 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.101(b):The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks were not in accordance with Compressed Gas Association Pamphlet P-1, which is incorporated by reference as specified in CFR 1910.6: 5.8.4 Cylinder positions in storage: All compressed gas cylinders in service or in storage at user locations shall be secured to prevent falling or rolling: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: One compressed gas cylinder of Argon was freestanding and was not secured by any device to prevent the cylinder from falling, rolling, or getting knocked over.
Recent events (2)
- — I (S) $4000
- — Z (S) $4783
1910.215 A04
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $5,627 · Current $500 Reduced
General-duty citation text
29 CFR 1910.215(a)(4):Work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Serial # 18060140) with the work rest on the right side of the grinder at approximately 5/8" from the grinding wheel/stone. The work rest had not been adjusted as the wheel was worn. b.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Serial # 18060140) with the work rest on the left side of the grinder at approximately 1/2" from the grinding wheel/stone. The work rest had not been adjusted as the wheel was worn. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $500
- — Z (S) $5627
1910.215 B09
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Model: IBG8VS; Serial # 18060140) with the tongue guard on the right side of the grinder located at approximately 1 and 3/8" inches from the grinding wheel/stone. The tongue guard had not been adjusted as the wheel was worn. b.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Model: IBG8VS; Serial # 18060140) with the tongue guard on the left side of the grinder located at approximately 1 and 3/4" inches from the grinding wheel/stone. The tongue guard had not been adjusted as the wheel was worn. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.215 D03
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $5,627 · Current $0 Reduced
General-duty citation text
29 CFR 1910.215(d)(3): The contact surface(s) of wheel(s), blotter(s) or flange(s) on grinding machine(s) were not flat and free of foreign matter: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Model: IBG8VS; Serial # 18060140) for grinding tungsten electrodes for TIG welding operations. Employees were potentially exposed to a struck-by hazard in that, the right grinding wheel had a groove worn into the middle of the grinding wheel. The surface of the wheel on the right side of the industrial grinder was not maintained in a flat condition. b.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees utilized a Jet industrial grinder (Model: IBG8VS; Serial # 18060140) for grinding tungsten electrodes for TIG welding operations. Employees were potentially exposed to a struck-by hazard in that, the left grinding wheel had a groove worn into the right side of the of the grinding wheel. The surface of the wheel on the left side of the industrial grinder was not maintained in a flat condition. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $5627
1910.252 B02 III
- Issued
- Apr 24, 2025
- Penalty
- Initial $4,783 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.252(b)(2)(iii):Workers and other persons adjacent to the welding area were not protected from the rays by noncombustible or flameproof screens or shields: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees working near or around TIG welding operations of various metals were not protected from welding rays, in that, the employees were not protected by welding shields or screens while working in and around the welding department area. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $4000
- — Z (S) $4783
1910.254 B04 IV
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $5,627 · Current $0 Reduced
General-duty citation text
29 CFR 1910.254(b)(4)(iv):Terminals for welding leads were not protected from accidental contact by personnel or metal objects: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: Employees were exposed to potential electrical shock hazards from unguarded or uncovered welding leads from the two grounding electrode leads connnected to the Miller 351 Syncrowave 351 AC/DC Welder (Serial number unidentifiable). The welder was used to perform TIG welding on aluminum and stainless-steel parts in the facility. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $5627
1910.254 D09 III
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replace: a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: The Miller 351 Syncrowave 351 AC/DC Welder (Serial number unidentifiable) contained an area on the ground wire where the insulation had been cut creating exposed wires. The welder was used to perform TIG welding on aluminum and stainless-steel parts in the facility. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1910.145 C03
- Issued
- Apr 24, 2025
- Abate by
- May 20, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.145(c)(3): Safety instruction sign(s) were not used where there was a need for general instructions and suggestions relative to safety measure(s): a.) Flowline Divison-Ezeflow USA Inc., Welding department area, on or about April 3rd, 2025 and times prior thereto: The Miller 351 Syncrowave 351 AC/DC Welder's serial plate label was defaced and was not legible to identify information including, but not limited to, the serial number for the equipment. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 331210)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348156209.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.