OSHA Inspection: L.K. GOODWIN CO., INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of L.K. GOODWIN CO., INC. in 20 TECHNOLOGY WAY, WEST GREENWICH, RI 02817 (NAICS 332323). OSHA activity number 348162892.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch L.K. Goodwin CO., INC. — free Get an email when a new federal OSHA severe-injury report for L.K. Goodwin CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
20 TECHNOLOGY WAY
City
WEST GREENWICH
State
RI
ZIP
02817
Mailing
20 TECHNOLOGY WAY, WEST GREENWICH, RI 02817
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332323
Employees
18
Ownership type
A

7 citations on file for this inspection.

1910.212 A01

Serious Gravity 10 2 instances 9 exposed
Issued
Jun 19, 2025
Abate by
Aug 5, 2025
Penalty
Initial $9,847 · Current $4,924 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks.  a) Piranha Ironworker 70: On or about April 7, 2025, employees were exposed to point of operation hazards associated with an unguarded ironworker machine.  b) Clausing Drill Press: On or about April 7, 2025, employees were exposed to flying chip and rotating part hazards associated with an unguarded drill press.
Recent events (2)
  • — I (S) $4923.5
  • — Z (S) $9847

1910.254 D09 III

Serious Gravity 5 3 instances 9 exposed
Issued
Jun 19, 2025
Abate by
Aug 5, 2025
Penalty
Initial $8,441 · Current $4,221 Reduced
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replaced.   a) Welder 1: On or about April 7, 2025, employees were exposed to electrical shock hazards when using welding leads with damaged insulation that were not replaced.  b) Welder 2: On or about April 7, 2025, employees were exposed to electrical shock hazards when using welding leads with damaged insulation that were not replaced.  c) Welder 3: On or about April 7, 2025, employees were exposed to electrical shock hazards when using welding grounds with damaged insulation that were not replaced.
Recent events (2)
  • — I (S) $4220.5
  • — Z (S) $8441

1910.38 F01

Other-than-serious 1 instance 12 exposed
Issued
Jun 19, 2025
Abate by
Aug 5, 2025
Penalty
Initial $790 · Current $395 Reduced
29 CFR 1910.38(f)(1): The employer did not review the Emergency Action Plan initially with each new employee and at the beginning of their assignment.  a) Jobsite: On or about April 7, 2025, the employer did not ensure all employees were trained in the company Emergency Preparedness and Action Plan.
Recent events (2)
  • — I (O) $395
  • — Z (O) $790

1910.147 C07 I

Other-than-serious 1 instance 7 exposed
Issued
Jun 19, 2025
Abate by
Aug 5, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees.  a) Jobsite: On or about April 7, 2025, the employer did not provide adequate lockout tagout training to all authorized and affected employees.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.303 B02

Other-than-serious 4 instances 10 exposed
Issued
Jun 19, 2025
Penalty
Initial $790 · Current $395 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling.  a) Flexo 40: On or about April 7, 2025, employees were exposed to electrical hazards when a power strip was plugged in with two extension cords plugged into the power strip  b) Flexo 50 right side: On or about April 7, 2025, employees were exposed to electrical hazards when a power strip was plugged into an extension cord, with three additional extension cords plugged into the power strip.  c) Flexo 50 middle: On or about April 7, 2025, employees were exposed to electrical hazards when a power strip was plugged into an extension cord, with an extension cord and fan plugged into the power strip  d) Back Building: On or about April 7, 2025, employees were exposed to electrical hazards when a power strip was plugged into an extension cord.
Recent events (2)
  • — I (O) $395
  • — Z (O) $790

1910.305 B02 I

Other-than-serious 1 instance 9 exposed
Issued
Jun 19, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy.  a) Front Wall Drill Press: On or about April 7, 2025, the employer did not ensure junction boxes were completely enclosed.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.305 G01 IV A

Other-than-serious 5 instances 9 exposed
Issued
Jun 19, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure.  a) Flexo 50 right wall: On or about April 7, 2025, a power strip was used as fixed wiring to energize extension cords.   b) Grinding Cart: On or about April 7, 2025, a power strip was used as fixed wiring to energize extension cords.   c) Flexo 50 middle: On or about April 7, 2025, a power strip was used as fixed wiring to energize extension cords.   d) Flexo 40: On or about April 7, 2025, a power strip was used as fixed wiring to energize extension cords.   e) Back Building: On or about April 7, 2025, a power strip was used as fixed wiring to energize extension cords.  f) Wall behind Flexo 50: On or about April 7, 2025, an extension cord was plugged in and wrapped around a steel beam and electrical tubing to energize a mounted fan.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View L.K. Goodwin CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348162892.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.