Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SINTEK NORTH AMERICA, LLC

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SINTEK NORTH AMERICA, LLC in 13609 INDUSTRIAL RD., HOUSTON, TX 77015 (NAICS 327390). OSHA activity number 348163197.

Watch Sintek North America, LLC — free Get an email when a new federal OSHA severe-injury report for Sintek North America, LLC is published. One employer, no account, unsubscribe in one click.
Site address
13609 INDUSTRIAL RD.
City
HOUSTON
State
TX
ZIP
77015
Mailing
1201 FANNIN ST. #262, HOUSTON, TX 77002
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
327390
Employees
15
Ownership type
A

3 citations on file for this inspection.

1926.251 A06

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $5958.00 · Current $5958.00
29 CFR  1926.251(a)(6): Each day before being used, and during use, where service conditions warrant, the sling and all fastenings and attachments were not inspected for damage or defects by a competent person, and damaged or defective slings were not immediately removed from service:  On or about April 1, 2025, at the cement terminal under construction, a competent person did not inspect the sling and all fastenings and attachments for damage or defects and damaged or defective slings were not immediately removed from service while employees were waiting to install a 40,000-pound truss from a JLG 1250 AJP Boom lift.
Recent events (2)
  • — C (S) $5958
  • — Z (S) $5958

1926.251 E08 III

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.251(e)(8)(iii): Synthetic web slings were not immediately removed from service when any of the following conditions were present: snags, punctures, tears or cuts.  On or about April 1, 2025, at the new concrete structure jobsite, employees used synthetic slings that showed snags, punctures, tears and cuts while lifting a metal truss with a crane. The damaged slings were not removed from service.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1926.1425 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $5958.00 · Current $5958.00
29 CFR  1926.1425(e)(1): 29 CFR 1926.1425(e)(1): Employees were directly under a load.   On or about April 1, 2025, at the cement terminal under construction, the employer did not prevent employees from working directly under a suspended 40,000-pound truss while employees were waiting to install the truss from a JLG 1250 AJP Boom lift.
Recent events (2)
  • — C (S) $5958
  • — Z (S) $5958

View SINTEK NORTH AMERICA, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348163197.