CHICAGO, IL —
OSHA Inspection: MASTER GROUP CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MASTER GROUP CONSTRUCTION, INC. in 3801 N OAKLEY AVENUE, CHICAGO, IL 60618 (NAICS 238140). OSHA activity number 348176926.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MASTER GROUP CONSTRUCTION, INC.
- Site address
- 3801 N OAKLEY AVENUE
- City
- CHICAGO
- State
- IL
- ZIP
- 60618
- Mailing
- 7321 DAVIS STREET, MORTON GROVE, IL 60053
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
10 citations on file for this inspection.
1926.100 A
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $2,837 · Current $1,500 Reduced
General-duty citation text
29 CFR 1926.100(a):Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) On April 11, 2025, employee(s) were exposed to head injury while working without protective helmets in areas below tuckpointing operations. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1500
- — Z (S) $2837
1926.451 B01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $4,965 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no(a)(LOCATION)(IDENTIFY SPECIFIC OPERATIONS AND/OR CONDITIONS)(DESCRIBE HAZARDS WHERE NECESSARY) a) On April 11, 2025, employees working from a tubular welded frame scaffolding were exposed to fall hazards of up to approximately 25 feet where the scaffold platform was not fully decked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $4965
1926.451 G01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1):Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. a) On April 11, 2025, employee(s) working from a tubular welded frame scaffolding were exposed to fall hazards of approximately 25 feet to the ground. b) On April 11, 2025, employee(s) working from a tubular welded frame scaffolding were exposed to fall hazards of approximately 20 feet to the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $4,965 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.451(e)(1):When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a) On April 11, 2025, employee(s) were exposed to fall hazards while accessing and egressing the work platform of a frame scaffold by climbing the scaffold cross braces. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2500
- — Z (S) $4965
1926.501 B13
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On April 11, 2025, employee(s) were exposed to fall hazards of approximately 17 feet while standing on the second story parapet wall. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1053 B01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(1):Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (0.9 m) above the upper landing surface being accessed: a) On April 11, 2025, employee(s) used an extensible ladder that was too short, and which did not extend at least 3 feet above the upper landing surface. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1053 B04
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(4):Ladder(s) were used for purposes other than the purpose for which they were designed: a) On April 11, 2025, two employee(s) used the extension ladder at the same time when descending from the work platform. b) On April 11, 2025, two employee(s) used the top rung of an extension ladder when descending from the work platform. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1060 A01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $3,547 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.1060(a)(1):The employer did not provide a training program for each employee using ladders as necessary, enabling each employee to recognize hazards related to ladders and the procedures to be followed to minimize these hazards. a) On April 11, 2025, employee(s) were exposed to fall hazards while using ladders and the employer did not provide a training program to recognize hazards and procedures to be followed to minimize these hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2000
- — Z (S) $3547
1926.451 C01
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $3,547 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.451(c)(1):Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph. a) On April 11, 2025, employee(s) were exposed to fall hazards while working on tubular welded frame scaffolding exceeding a 4:1 height to base width ratio which was not restrained from tipping by any means. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2000
- — Z (S) $3547
1926.451 C02
- Issued
- May 30, 2025
- Abate by
- Jun 18, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2):Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates and mud sills or other adequate firm foundation: a) On April 11, 2025, employee(s) were exposed to fall hazards while working on tubular welded frame scaffolding whose legs did not bear on base plates. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Master Group Construction, INC.
View Master Group Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348176926.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.