Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MARATHON CONSTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARATHON CONSTRUCTION INC. in 220 BLACKSTONE STREET, PROVIDENCE, RI 02905 (NAICS 236116). OSHA activity number 348207085.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marathon Construction INC. — free Get an email when a new federal OSHA severe-injury report for Marathon Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
220 BLACKSTONE STREET
City
PROVIDENCE
State
RI
ZIP
02905
Mailing
500 HARRISON AVENUE SUITE 4RB, BOSTON, MA 02118
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
3
Ownership type
A

2 citations on file for this inspection.

1926.451 B01 I

Serious Gravity 5 1 instance 7 exposed
Issued
Jun 19, 2025
Penalty
Initial $3,537 · Current $2,476 Reduced
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary.  (a) Worksite - Westside Scaffold Stairwell: On or about 4/28/2025, the employer did not ensure the westside scaffold staircase was fully planked.
Recent events (2)
  • — I (S) $2475.9
  • — Z (S) $3537

1926.451 F03

Serious Gravity 5 1 instance 7 exposed
Issued
Jun 19, 2025
Abate by
Aug 5, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.  (a) Worksite - Westside Scaffold Stairwell: On or about 4/28/2025, the westside scaffold stairwell was not inspected for visible defects by a competent person before each work shift.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Marathon Construction INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348207085.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.