ARLINGTON HEIGHTS, IL —
OSHA Inspection: ACE NATIONWIDE CONSTRUCTION, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ACE NATIONWIDE CONSTRUCTION, LLC in 2175 S. TONNE DR., ARLINGTON HEIGHTS, IL 60005 (NAICS 238160). OSHA activity number 348235581.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ACE NATIONWIDE CONSTRUCTION, LLC
- Site address
- 2175 S. TONNE DR.
- City
- ARLINGTON HEIGHTS
- State
- IL
- ZIP
- 60005
- Mailing
- 700 ROCKNEAD DR, SUITE 159, KINGWOOD, TX 77339
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 18
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.502 D15
- Issued
- Aug 13, 2025
- Abate by
- Apr 2, 2026
- Penalty
- Initial $3,972 · Current $1,986 Reduced
General-duty citation text
29 CFR 1926.502(d)(15): Anchorage points used for attachment of personal fall arrest equipment were not independent of any anchorage point being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee a) On May 8, 2025, personal fall arrest equipment was attached to vent pipes for anchorage. These pipes were not capable of supporting at least 5,000 pounds per employee. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $1986
- — C (S) $3972
- — Z (S) $3972
1926.502 D17
- Issued
- Aug 13, 2025
- Abate by
- Apr 2, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(17): The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head: a) On May 8, 2025, employees were exposed to fall hazards while using a harness with the attachment point not in the center of the wearers' back near shoulder level. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.502 D21
- Issued
- Aug 13, 2025
- Abate by
- Apr 2, 2026
- Penalty
- Initial $3,972 · Current $1,986 Reduced
General-duty citation text
29 CFR 1926.502(d)(21): Personal fall arrest systems were not inspected prior to each use for wear, damage, and other deterioration, and/or defective components were not removed from service: a) On May 8, 2025, person fall arrest systems used by employees were not inspected for wear, damage, and other deterioration during work on a pitched roof having a ground to eave height of approximately 17 feet and damaged and worn equipment was not removed from service.. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $1986
- — C (S) $3972
- — Z (S) $3972
1926.503 A01
- Issued
- Aug 13, 2025
- Abate by
- Apr 2, 2026
- Penalty
- Initial $2,838 · Current $1,419 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) On May 8, 2025, employees were exposed to fall hazards while working on a pitched roof and were not provided training on the recognition of the hazards of falling and the procedures to be followed in order to minimize these hazards. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $1419
- — C (S) $2838
- — Z (S) $2838
1926.501 B13
- Issued
- Aug 13, 2025
- Abate by
- Apr 2, 2026
- Penalty
- Initial $26,482 · Current $13,241 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On May 8, 2025, employees were exposed to fall hazards while working without fall protection from a pitched roof having a ground to eave height of approximately 17 feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (W) $13241
- — C (W) $26482
- — Z (W) $26482
More inspections at ACE Nationwide Construction, LLC
View ACE Nationwide Construction, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348235581.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.