WASHINGTON, DC —
OSHA Inspection: KJM CONSTRUCTION LLC
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of KJM CONSTRUCTION LLC in 2619 WISCONSIN AVE NW, WASHINGTON, DC 20016 (NAICS 238910). OSHA activity number 348282559.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- KJM CONSTRUCTION LLC
- Site address
- 2619 WISCONSIN AVE NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20016
- Mailing
- 6025 FAIRVIEW PL, FALLS CHURCH, VA 22043
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238910
- Employees
- 11
- Ownership type
- A
Citations
9 citations on file for this inspection.
1926.451 B01
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $4,965 · Current $3,600 Reduced
General-duty citation text
29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, employees were observed working on scaffold system in which the working platform was not fully planked, exposing them to an estimated 25-foot fall while conducting masonry work. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $3600
- — Z (S) $4965
1926.451 B05 I
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(5)(i):The end of a platform 10 feet or less in length, extended over its support more than 12 inches: a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC. The employer had installed the planks of the working platform an estimated eighteen inches beyond the support creating a cantilever effect and exposing the employees to a potential fall hazard of 25 feet while conducting their assigned masonry work. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 F07
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(7):Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, the scaffold system erected on the rear of the site had several hazards, including but not limited to incomplete planking, and lack of fall protection. A competent person should have been aware of these hazards and know how to abate them before having employees working on the scaffold. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01 VII
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(vii):Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, employees were exposed to an estimated 20-foot fall hazard while working on an unguarded scaffold system while conducting masonry work on the exterior of the residential home. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G04 I
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4)(i):Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, the scaffold system's working platform was not guarded by railings to prevent employees from falling an estimated 20 feet to ground level. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B13
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $4,965 · Current $3,600 Reduced
General-duty citation text
29 CFR 1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, Roof area, employees were exposed to a 20-foot fall hazard while engaged in masonry activities while working at or near wall openings without fall protection. b) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, Roof area, employees were exposed to a 20-foot fall hazard while engaged in masonry activities or accessing the work area by walking near unguarded floor opening. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $3600
- — Z (S) $4965
1926.503 B01
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1):The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC; Roof area; the employer had not certified the fall protection training to employees that may be exposed to fall hazards 6-feet while conducting masonry work. In accordance with 29 CFR 1903.19(d), abatement ce1tification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1053 B01
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $4,965 · Current $3,600 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1):Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, employees were using an 8-foot Werner step ladder that did not extend three feet above the working platform. In accordance with 29 CFR 1903.19(d), abatement ce1tification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $3600
- — Z (S) $4965
1926.1053 B13
- Issued
- Nov 26, 2025
- Abate by
- Mar 11, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(13):The top or step of a stepladder was used as a step: a) On or about June 6, 2025, at a worksite located at 2619 Wisconsin Ave NW, Washington, DC, while accessing the upper floor the employee was using the top step of a 8-foot Werner step ladder, exposing him to a 10-foot fall hazard. In accordance with 29 CFR 1903.19(d), abatement ce1tification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at KJM Construction LLC
View KJM Construction LLC's full OSHA safety record →
More inspections in this industry (NAICS 238910)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348282559.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.