Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: JUAN FLORES DBA FLORES PLASTERING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JUAN FLORES DBA FLORES PLASTERING in 708 S PROSPECT AVENUE, PARK RIDGE, IL 60068 (NAICS 238140). OSHA activity number 348339250.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Juan Flores DBA Flores Plastering — free Get an email when a new federal OSHA severe-injury report for Juan Flores DBA Flores Plastering is published. One employer, no account, unsubscribe in one click.
Site address
708 S PROSPECT AVENUE
City
PARK RIDGE
State
IL
ZIP
60068
Mailing
3416 EMERALD AVE, STEGER, IL 60475
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

4 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Dec 11, 2025
Abate by
Jan 30, 2026
Penalty
Initial $319 · Current $319
29 CFR  1903.19(c)(1):29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:   Juan Flores dba Flores Plastering, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date 01                                                      02b                                  09/10/2025   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $319

1926.451 C02

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 14, 2025
Penalty
Initial $2,270 · Current $2,270
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:  a) On June 23, 2025, the framed scaffolding that the employees were working from had base plates that were supported by unstable wooden blocks.  No abatement certification or documentation is required for this item.
Recent events (1)
  • — Z (S) $2270

1926.451 G01

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 14, 2025
Penalty
Initial $3,972 · Current $3,972
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  a) On June 23, 2025, employees working from frame scaffolding were exposed to the hazard of falling approximately 15 feet to the ground below.  No abatement certification or documentation is required for this item.
Recent events (1)
  • — Z (S) $3972

1926.501 B13

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 14, 2025
Abate by
Sep 10, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a)  On June 23, 2025, employees applying stucco to the exterior of an existing two-story residential structure from the roof  were not protected from fall hazards while working at an elevation of approximately 12 feet above the ground.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

View Juan Flores DBA Flores Plastering's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348339250.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.