OSHA Inspection: MORALES CONTRACTOR, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MORALES CONTRACTOR, L.L.C. in 600 SHREWSBURY STREET COVENANT HOUSE, CHARLESTON, WV 25301 (NAICS 238170). OSHA activity number 348358219.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Morales Contractor, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Morales Contractor, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
600 SHREWSBURY STREET COVENANT HOUSE
City
CHARLESTON
State
WV
ZIP
25301
Mailing
141 CAROLINE CIRCLE, HURRICANE, WV 25526
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238170
Employees
7
Ownership type
A

8 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $3,972 · Current $3,500 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii).   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working from a pump jack scaffold approximately 22 feet above grade were exposed to fall hazards because the scaffold platforms were not fully planked or decked between the uprights/poles and pump jack brackets, leaving gaps of approximately 6 inches to 12 inches on either side of platforms that were approximately 12 inches to 18 inches wide, exposing employees to falls to a lower level.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $3972

1926.451 B05 II

Serious Gravity 5 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $2,838 · Current $2,500 Reduced
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform was able to support employees without tipping, or had guardrails which blocked employee access to the cantilevered end.  (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working from a pump jack scaffold approximately 22 feet above grade were exposed to fall hazards because scaffold platforms greater than 10 feet in length extended approximately 9 feet to 12 feet beyond their supports on either side of the pump jack structural poles and were not designed or installed to safely support employees without tipping.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $2838

1926.451 B10

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $3,972 · Current $1,500 Reduced
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers were intermixed not allowing the components to fit together to maintain the scaffold's structural integrity.   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working from a pump jack scaffold approximately 22 feet above grade were exposed to fall hazards because scaffold platforms were bridged and interconnected using components of different widths and types, which were not designed to fit together and were not determined by a competent person to maintain structural integrity, exposing employees fall hazards from unstable walking/working surfaces.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $3972

1926.451 C02

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $3,972 · Current $1,500 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation.    (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working from a pump jack scaffold approximately 22 feet above grade were exposed to fall hazards from potential collapse because supported scaffold poles were sitting on concrete and did not bear on base plates, mud sills, or other adequate firm foundations.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $3972

1926.451 G01

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $3,972 · Current $3,500 Reduced
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level.   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees performing siding installation from a pump jack scaffold approximately 22 feet above grade were not protected from falling by a guardrail system, personal fall arrest system, or other approved means of fall protection, exposing employees to fall hazards.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $3972

1926.452 J02

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $3,972 · Current $2,500 Reduced
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working from a pump jack scaffold approximately 22 feet above grade were exposed to collapse and fall hazards because the aluminum scaffold poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom and other points as necessary.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $3972

1926.501 B01

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $1,702 · Current $1,500 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, employees working on a 3/12 pitched roof surface approximately 9 feet 5 inches above grade were exposed to fall hazards because the roof edge was unprotected and no guardrail system, safety net system, or personal fall arrest system was being used.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $1702

1926.1053 B13

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 8, 2026
Abate by
Jan 16, 2026
Penalty
Initial $1,702 · Current $1,500 Reduced
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step.   (a) Covenant House, Charleston, WV Jobsite: On or about July 8, 2025, an employee using a Werner 10-foot stepladder was exposed to fall hazards because the employee used the top step of the stepladder as a working surface while installing siding around an exterior light fixture.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $1702

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348358219.