OSHA Inspection: SPAN CONSTRUCTION & ENGINEERING, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SPAN CONSTRUCTION & ENGINEERING, INC. in 6717 CARLISLE PIKE, MECHANICSBURG, PA 17050 (NAICS 238120). OSHA activity number 348395963.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Span Construction & Engineering, INC. — free Get an email when a new federal OSHA severe-injury report for Span Construction & Engineering, INC. is published. One employer, no account, unsubscribe in one click.
Site address
6717 CARLISLE PIKE
City
MECHANICSBURG
State
PA
ZIP
17050
Mailing
3353 YEAGER DRIVE, MADERA, CA 93637
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
30
Ownership type
A

3 citations on file for this inspection.

1926.503 C03

Other-than-serious Gravity 10 1 instance 5 exposed
Issued
Dec 12, 2025
Penalty
Initial $11,585 · Current $7,200 Reduced
1926.503(c)(3)  Inadequacies in an affected employee's knowledge or use of fall protection systems or equipment indicate that the employee has not retained the requisite understanding or skill.  (a)  6717 Carlisle Pike, Mechanicsburg, PA:  On or about July 23, 2025, employees of Span Construction and Engineering were working on a roof that was in excess of 30 feet above grade with uncovered openings in the roof and no fall protection system.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $7200
  • — C (S) $11585
  • — Z (S) $11585

1926.501 B04 II

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Dec 12, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.501(b)(4)(ii):Each employee on a walking/working surface was not protected from tripping in or stepping into or through holes by covers.  (a)  6717 Carlisle Pike, Mechanicsburg, PA:  On or about July 23, 2025, employees of Span Construction and Engineering were working on a roof that was in excess of 30 feet above grade with uncovered openings in the roof and no fall protection system.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.501 B10

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Dec 12, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.501(b)(10):Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system.  (a)  6717 Carlisle Pike, Mechanicsburg, PA:  On or about July 23, 2025, employees were working on a roof that was in excess of 30 feet above grade without a complete fall protection system.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

View Span Construction & Engineering, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348395963.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.