Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BAILON'S STUCCO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BAILON'S STUCCO in 12705 QUAKER AVE, LUBBOCK, TX 79424 (NAICS 238190). OSHA activity number 348402785.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Bailon'S Stucco — free Get an email when a new federal OSHA severe-injury report for Bailon'S Stucco is published. One employer, no account, unsubscribe in one click.
Establishment
BAILON'S STUCCO
Site address
12705 QUAKER AVE
City
LUBBOCK
State
TX
ZIP
79424
Mailing
13916 DELTA DR., VENUS, TX 76084
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238190
Employees
4
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 3 instances 2 exposed
Issued
Mar 16, 2026
Abate by
May 4, 2026
Penalty
Initial $319 · Current $319
29 CFR  1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violations had been abated.  (a) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?a, Item 1 (29 CFR 1926.451(b)(1)), issued on 08/13/2025, with an abatement due date of 09/11/2025. (b) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?b, Item 1 (29 CFR 1926.451(e)(1)), issued on 08/13/2025, with an abatement due date of 09/11/2025. (c) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?c, Item 1 (29 CFR 1926.451(g)(4)(i)), issued on 08/13/2025, with an abatement due date of 09/11/2025.
Recent events (1)
  • — Z (O) $319

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 13, 2025
Abate by
Sep 11, 2025
Penalty
Initial $2,270 · Current $2,270
29 CFR  1926.451(b)(1):Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is not planked  On or about  July 24, 2025, adjacent entrance to building on fourth tier of scaffold, employees utilized a scaffold that was not fully planked while performing stucco work on the exterior of the building.
Recent events (1)
  • — Z (S) $2270

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 13, 2025
Abate by
Sep 11, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.451(e)(1):When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.  On or about July 24, 2025, adjacent entrance of building, employees utilized a scaffold without ladders for access and egress while performing stucco work on the exterior of the building.
Recent events (1)
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 13, 2025
Abate by
Sep 11, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.451(g)(4)(i):29 CFR 1926.451(g)(4)(i):  Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews.  On or about  July 24, 2025, adjacent entrance to building on fourth tier of scaffold, employees utilized a scaffold with missing end guardrail systems while performing stucco work on the exterior of the building.
Recent events (1)
  • — Z (S) $0

1926.453 B02 V

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 13, 2025
Penalty
Initial $1,929 · Current $1,929
29 CFR  1926.453(b)(2)(v):A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift. Note to paragraph (b)(2)(v): As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated under 1926.502(e).  On or about July 24, 2025, on the southwest side of building, an employee utilized a Genie aerial lift without fall protection while performing stucco work on the exterior of the building.
Recent events (1)
  • — Z (S) $1929

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348402785.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.