LUBBOCK, TX —
OSHA Inspection: BAILON'S STUCCO
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BAILON'S STUCCO in 12705 QUAKER AVE, LUBBOCK, TX 79424 (NAICS 238190). OSHA activity number 348402785.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BAILON'S STUCCO
- Site address
- 12705 QUAKER AVE
- City
- LUBBOCK
- State
- TX
- ZIP
- 79424
- Mailing
- 13916 DELTA DR., VENUS, TX 76084
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238190
- Employees
- 4
- Ownership type
- A
Citations
5 citations on file for this inspection.
1903.19 C01
- Issued
- Mar 16, 2026
- Abate by
- May 4, 2026
- Penalty
- Initial $319 · Current $319
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violations had been abated. (a) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?a, Item 1 (29 CFR 1926.451(b)(1)), issued on 08/13/2025, with an abatement due date of 09/11/2025. (b) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?b, Item 1 (29 CFR 1926.451(e)(1)), issued on 08/13/2025, with an abatement due date of 09/11/2025. (c) On or about 12/22/2025, the employer failed to submit certification of corrective action for Citation 1?1?c, Item 1 (29 CFR 1926.451(g)(4)(i)), issued on 08/13/2025, with an abatement due date of 09/11/2025.
Recent events (1)
- — Z (O) $319
1926.451 B01
- Issued
- Aug 13, 2025
- Abate by
- Sep 11, 2025
- Penalty
- Initial $2,270 · Current $2,270
General-duty citation text
29 CFR 1926.451(b)(1):Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is not planked On or about July 24, 2025, adjacent entrance to building on fourth tier of scaffold, employees utilized a scaffold that was not fully planked while performing stucco work on the exterior of the building.
Recent events (1)
- — Z (S) $2270
1926.451 E01
- Issued
- Aug 13, 2025
- Abate by
- Sep 11, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1):When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access. On or about July 24, 2025, adjacent entrance of building, employees utilized a scaffold without ladders for access and egress while performing stucco work on the exterior of the building.
Recent events (1)
- — Z (S) $0
1926.451 G04 I
- Issued
- Aug 13, 2025
- Abate by
- Sep 11, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4)(i):29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews. On or about July 24, 2025, adjacent entrance to building on fourth tier of scaffold, employees utilized a scaffold with missing end guardrail systems while performing stucco work on the exterior of the building.
Recent events (1)
- — Z (S) $0
1926.453 B02 V
- Issued
- Aug 13, 2025
- Penalty
- Initial $1,929 · Current $1,929
General-duty citation text
29 CFR 1926.453(b)(2)(v):A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift. Note to paragraph (b)(2)(v): As of January 1, 1998, subpart M of this part (1926.502(d)) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated under 1926.502(e). On or about July 24, 2025, on the southwest side of building, an employee utilized a Genie aerial lift without fall protection while performing stucco work on the exterior of the building.
Recent events (1)
- — Z (S) $1929
More inspections in this industry (NAICS 238190)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348402785.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.