TIMEWELL, IL —
OSHA Inspection: C & L TILING, INC DBA TIMEWELL DRAINAGE PRODUCTS
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of C & L TILING, INC DBA TIMEWELL DRAINAGE PRODUCTS in 196 US 24 1075 NORTH AVENUE, TIMEWELL, IL 62375 (NAICS 326122). OSHA activity number 348449794.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- C & L TILING, INC DBA TIMEWELL DRAINAGE PRODUCTS
- Site address
- 196 US 24 1075 NORTH AVENUE
- City
- TIMEWELL
- State
- IL
- ZIP
- 62375
- Mailing
- 196 US 24 1075 NORTH AVENUE, TIMEWELL, IL 62375
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326122
- Employees
- 76
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 D
- Issued
- Jan 13, 2026
- Abate by
- Jan 29, 2026
- Penalty
- Initial $10,854 · Current $7,597 Reduced
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): On or about August 7, 2025, employees were exposed to machine hazards associated with moving parts, in-going nip points, and other hazards associated with conveyors during set-up activities during a change over on Line 6. The employer failed to implement energy control application steps as the machine was shut down or turned off to perform the servicing work [per the 1910.147(d)(2) requirements]. The remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine servicing hazards.
Recent events (2)
- — I (S) $7597.2
- — Z (S) $10854
1910.303 B01
- Issued
- Jan 13, 2026
- Abate by
- Feb 12, 2026
- Penalty
- Initial $16,550 · Current $11,585 Reduced
General-duty citation text
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees, in that the employer did not ensure the safety of the equipment pursuant to the considerations in sections (i) through (viii) of 29 CR 1910.303(b)(1): On or about August 19, 2025 employees working near Line 6 were exposed to electrical hazards and the employer had not examined the equipment to ensure that the use of flexible cords were suitable for the installation and use as required by the provisions in Subpart S.
Recent events (2)
- — I (S) $11585
- — Z (S) $16550
1910.305 G01 IV A
- Issued
- Jan 13, 2026
- Abate by
- Feb 12, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: On or about August 19, 2025, employees working near the conveyor on Line 6 were exposed to electrical hazards and the employer had not ensured that a flexible cord was not used in lieu of fixed wiring.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1904.39 A02
- Issued
- Jan 13, 2026
- Penalty
- Initial $10,854 · Current $7,598 Reduced
General-duty citation text
29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in in-patient hospitalization, amputation or the loss of an eye: On or about August 7, 2025, an employee was admitted to the hospital after suffering an electrical shock and the employer did not report the hospitalization to OSHA within 24 hours.
Recent events (2)
- — I (O) $7597.8
- — Z (O) $10854
1910.178 A04
- Issued
- Jan 13, 2026
- Abate by
- Feb 12, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval: On or about August 19, 2025, the CSHO observed a Toyota forklift with an approximately 20 foot long shop made boom and the employer had not obtained written approval from the manufacturer before using the boom.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.178 A05
- Issued
- Jan 13, 2026
- Abate by
- Feb 12, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(5): The powered industrial truck was equipped with front-end attachments other than factory installed attachments, however the employer did not request that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered: On or about August 19, 2025, the CSHO observed a Toyota forklift with an approximately 20 foot long shop made boom and the employer had not requested that the data plate be changed to identify the boom and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 326122)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348449794.