Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BALFOUR BEATTY-GILBANE JV

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of BALFOUR BEATTY-GILBANE JV in 1951 CONSTITUTION AVENUE, NORTHWEST, WASHINGTON, DC 20006 (NAICS 236220). OSHA activity number 348453358.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Balfour Beatty-Gilbane JV — free Get an email when a new federal OSHA severe-injury report for Balfour Beatty-Gilbane JV is published. One employer, no account, unsubscribe in one click.
Site address
1951 CONSTITUTION AVENUE, NORTHWEST
City
WASHINGTON
State
DC
ZIP
20006
Mailing
1951 CONSTITUTION AVENUE, NORTHWEST, WASHINGTON, DC 20006
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
70
Ownership type
A

2 citations on file for this inspection.

1904.29 B01

Deleted Other-than-serious 1 instance 1 exposed
Issued
Jan 6, 2026
Abate by
Jan 28, 2026
Penalty
Initial $1,407 · Current $0 Reduced
29 CFR  1904.29(b)(1):A log of all recordable work-related injuries and illness (OSHA Form 300 or equivalent) was not completed in the detail required by the regulation.  a) On or about September 5, 2025, employer submitted their 2025 OSHA 300 Log for the Eccles/1951 Reno project located at 1952 Constitution Avenue, Northwest Washington, D.C. missing details required by the standard.  No abatement certification or documentation required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $1407

1904.29 B02

Deleted Other-than-serious 1 instance 1 exposed
Issued
Jan 6, 2026
Abate by
Jan 28, 2026
Penalty
Initial $0 · Current $0
29 CFR  1904.29(b)(2):The employer did not fill out or correctly fill out an OSHA Form 301 or equivalent for each recordable injury or illness.  a) On or about September 5, 2025, employer submitted their 2025 OSHA 301 Log for the Eccles/1951 Reno project located at 1952 Constitution Avenue, Northwest Washington, D.C. missing details required by the standard.  No abatement certification or documentation required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348453358.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.