WORCESTER, MA —
OSHA Inspection: SLIDEWAYS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SLIDEWAYS, INC. in 705 PLANTATION STREET, WORCESTER, MA 01605 (NAICS 326199). OSHA activity number 348460395.
Where did this inspection happen?
- Establishment
- SLIDEWAYS, INC.
- Site address
- 705 PLANTATION STREET
- City
- WORCESTER
- State
- MA
- ZIP
- 01605
- Mailing
- 705 PLANTATION STREET, WORCESTER, MA 01605
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 24
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C01
- Issued
- Abate by
- Penalty
- Initial $2838.00 · Current $1419.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(1): The employer had not established a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: 705 Plantation St, Worcester MA: On and before August 22, 2025, the employer had not established an energy control program to protect employees and outside contractors who performed maintenance and servicing activities on Haas CNC machinery. *Abatement Notes: Energy control procedures are required to be documented for all multiple-energy source machines. Documented energy control procedures are not required for hardwired single energy source machines, but the employer must ensure they are isolated, locked out, and verified as isolated. Energy control training is required to be documented and provided to ensure that the purpose and function of the energy control program are understood by employees. Employer must ensure that authorized employees acquire the knowledge and skills required for the safe application, usage, and removal of the energy controls to protect themselves and outside contractors. Periodic inspections are required for documented energy control procedures and shall include the following elements: - Appointment of an authorized employee to inspect each local procedure for inaccuracies during an energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections *Abatement notes are intended only to provide clarity regarding existing requirements under the law or agency policies. Abatement notes do not create (or diminish) legal obligations under the Occupational Safety and Health Act.
Recent events (2)
- — I (S) $1419
- — Z (S) $2838
1904.41 A01 I
- Issued
- Penalty
- Initial $482.00 · Current $241.00 Reduced
General-duty citation text
29 CFR 1904.41(a)(1)(i): The establishment had 20 or more employees but fewer than 250 employees during the previous calendar year, the establishment was classified in an industry listed in appendix A to subpart E of this part, and the employer did not electronically submit information from OSHA Form 300A Summary of Work-Related Injuries and Illnesses to OSHA or OSHA's designee by the specified date: 705 Plantation St, Worcester MA: As of August 21, 2025, the employer had not electronically submitted the information from their 2024 OSHA Form 300A. The employer's 2024 OSHA 300A for this establishment listed 24 employees and the employer's North American Industry Classification System code was 326199-All Other Plastics Product Manufacturing .
Recent events (2)
- — I (O) $241
- — Z (O) $482
More inspections in this industry (NAICS 326199)
ERIE, PA—2026-07-14
CAPLUGS, LLC
CONNEAUT, OH—2026-07-13
CONTINENTAL STRUCTURAL PLASTICS
PETALUMA, CA—2026-07-10
LABCON NORTH AMERICA
KEEWATIN, MN—2026-07-09
111565 - TACKLE TAMER PRODUCTS INC
EAST FLAT ROCK, NC—2026-07-09
161517 - ELKAMET, INC.
More inspections in MA
BELLINGHAM, MA—2026-07-16
BELLINGHAM DEPARTMENT OF PUBLIC WORKS
PLYMOUTH, MA—2026-07-15
TECH-ETCH, INC.
WESTFIELD, MA—2026-07-15
BOISE CASCADE BUILDING MATERIALS DISTRIBUTION, L.L.C.
QUINCY, MA—2026-07-15
UNITEDWOR VM CONTRACTOR CORP
FALL RIVER, MA—2026-07-15
CRESCO LABS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348460395.