Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ROMERO CONSTRUCTION, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ROMERO CONSTRUCTION, L.L.C. in 220 RAILWAY LN, HAGERSTOWN, MD 21740 (NAICS 238140). OSHA activity number 348470154.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Romero Construction, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Romero Construction, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
220 RAILWAY LN
City
HAGERSTOWN
State
MD
ZIP
21740
Mailing
5439 FORCE RD, BALTIMORE, MD 21206
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

18 citations on file for this inspection.

1926.20 B01

Serious Gravity 6 1 instance 3 exposed
Issued
Oct 21, 2025
Abate by
Nov 24, 2025
Penalty
Initial $1,500 · Current $1,050 Reduced
Recent events (2)
  • — I (S) $1050
  • — Z (S) $1500

1926.50 G

Serious Gravity 5 1 instance 2 exposed
Issued
Oct 21, 2025
Penalty
Initial $1,250 · Current $875 Reduced
Recent events (2)
  • — I (S) $875
  • — Z (S) $1250

1926.102 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $1,250 · Current $875 Reduced
Recent events (2)
  • — I (S) $875
  • — Z (S) $1250

1926.451 B01

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $1,750 · Current $1,225 Reduced
Recent events (2)
  • — I (S) $1225
  • — Z (S) $1750

1926.451 E01

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F03

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F07

Serious Gravity 7 1 instance 3 exposed
Issued
Oct 21, 2025
Abate by
Nov 24, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 H02 II

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 C02

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 C04

Serious Gravity 7 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.453 B02 V

Serious Gravity 6 1 instance 1 exposed
Issued
Oct 21, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 A

Serious Gravity 7 2 instances 3 exposed
Issued
Oct 21, 2025
Abate by
Nov 24, 2025
Penalty
Initial $0 · Current $0
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 G01

Repeat Gravity 6 1 instance 2 exposed
Issued
Oct 21, 2025
Penalty
Initial $3,000 · Current $2,100 Reduced
Recent events (2)
  • — I (R) $2100
  • — Z (R) $3000

1910.1200 H01

Repeat Gravity 6 1 instance 3 exposed
Issued
Oct 21, 2025
Abate by
Nov 24, 2025
Penalty
Initial $3,000 · Current $3,000
Recent events (2)
  • — I (R) $3000
  • — Z (R) $3000

1926.51 F01

Repeat Gravity 5 1 instance 2 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $2,500 · Current $1,750 Reduced
Recent events (2)
  • — I (R) $1750
  • — Z (R) $2500

1926.454 B

Repeat Gravity 7 1 instance 3 exposed
Issued
Oct 21, 2025
Abate by
Nov 24, 2025
Penalty
Initial $3,500 · Current $2,100 Reduced
Recent events (2)
  • — I (R) $2100
  • — Z (R) $3500

1910.1200 E01 I

Repeat Gravity 5 1 instance 3 exposed
Issued
Oct 21, 2025
Abate by
Oct 29, 2025
Penalty
Initial $1,000 · Current $700 Reduced
Recent events (2)
  • — I (R) $700
  • — Z (R) $1000

View Romero Construction, L.L.C.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348470154.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.