Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: H2O INNOVATION OPERATIONS & MAINTENANCE, LLC

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of H2O INNOVATION OPERATIONS & MAINTENANCE, LLC in 22 CREEKS EDGE, TRINITY, TX 75862 (NAICS 221320). OSHA activity number 348472143.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch H2O Innovation Operations & Maintenance, LLC — free Get an email when a new federal OSHA severe-injury report for H2O Innovation Operations & Maintenance, LLC is published. One employer, no account, unsubscribe in one click.
Site address
22 CREEKS EDGE
City
TRINITY
State
TX
ZIP
75862
Mailing
27335 WEST HARDY ROAD, SPRING, TX 77373
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
221320
Employees
171
Ownership type
A

12 citations on file for this inspection.

1910.28 B03 I

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.28(b)(3)(i): The employer did not ensure each employee is protected from falling through any hole (including skylights) that is 4 feet (1.2 m) or more above a lower level by one or more of the following: covers, guardrail systems, travel restraint systems, or personal fall arrest systems, as required by sub-items A through D of this section.   On or about August 27, 2025, at the Lift Station 20 job site where employees did not utilize a fall protection system when exposed to a fall greater than 4 feet through the manhole while repairing a pump.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.134 D01 III

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.134(d)(1)(iii):Where the employer could not identify or reasonably estimate the employee exposure to respiratory hazard(s) in the workplace, the employer did not consider the atmosphere to be IDLH:  On or about August 27, 2025, at the Lift Station 20 job site the employer did not consider the atmosphere to be IDLH and did not conduct a reasonable estimate of employees' exposure to atmospheric hazards while employees were repairing a sewage waste pump.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.146 D02

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $0 Reduced
29 CFR  1910.146(d)(2):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not identify and evaluate the hazards of permit spaces before employees entered:  On or about August 27, 2025, at the Lift Station 20  job site, the identification and evaluation of hazards such as but not limited to, fire, engulfment, falls and biohazards, was not conducted before employees made entry.
Recent events (2)
  • — I (S) $0
  • — Z (S) $16550

1910.146 D03

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.146(d)(3):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement the means, procedures, and practices necessary for safe permit space entry operations:  On or about August 27, 2025, at the Lift Station 20 job site where means, procedures, and practices necessary for safe permit space entry operations were not implemented for employees working in a permit required confined space.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.146 E01

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $0 · Current $0
29 CFR  1910.146(e)(1):Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit:  On or about August 27, 2025,  at the Lift Station 20 job site, an entry permit was not completed before employees made entry into the permit required confined space.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D04 I

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.146(d)(4)(i):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not provide employee with testing and monitoring equipment:  On or about August 27, 2025, at the Lift Station 20 job site, testing and monitoring equipment was not utilized prior to employees entering the confined space.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.146 D04 II

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $0 Reduced
29 CFR  1910.146(d)(4)(ii):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not provide, ventilating equipment needed to obtain acceptable entry conditions:  On or about August 27, 2025, at the Lift Station 20 job site where employees were not provided ventilating equipment needed for safe entry into a permit required confined space.
Recent events (2)
  • — I (S) $0
  • — Z (S) $16550

1910.146 D04 VIII

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.146(d)(4)(viii):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not provide, at no cost to the employees, rescue and emergency equipment needed to comply with 29 CFR 1910.146(d)(9):  On or about August 27, 2025,  at the Lift Station 20 job site where employees were not provided with rescue and emergency equipment needed for rescue.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.146 D09

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $0 · Current $0
29 CFR  1910.146(d)(9):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not develop and implement procedures for summoning rescue and emergency services, for rescuing entrants from permit spaces:  On or about August 27, 2025, at the Lift Station 20 job site where procedures for summoning rescue and emergency services were not implemented where employees were working in a permit required confined space.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 D08

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $16,550
29 CFR  1910.146(d)(8):Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not designate the persons who were to have active roles in entry operations, identify the duties of each such employee:  On or about August 27, 2025, at the Lift Station 20 job site, employees were not designated or identified to perform the active roles required for safe entry into the permit required confined space, including authorized entrants, attendants, and entry supervisors.
Recent events (2)
  • — I (S) $16550
  • — Z (S) $16550

1910.146 G01

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $700 Reduced
29 CFR  1910.146(g)(1):The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146:  On or about August 27, 2025, at the Lift Station 20 job site, employees working inside the confined space did not have confined space training.
Recent events (2)
  • — I (S) $700
  • — Z (S) $16550

1910.151 B

Deleted Serious Gravity 10 1 instance 4 exposed
Issued
Feb 27, 2026
Abate by
Mar 11, 2026
Penalty
Initial $16,550 · Current $0 Reduced
29 CFR  1910.151(b):There was neither an infirmary, clinic, or hospital used for the treatment of all injured employees in near proximity to the workplace nor a person or persons adequately trained to render first aid:  On or about August 27, 2025, at the lift station 20 jobsite, a person adequately trained to render first aid was not available while employees were working inside a confined space containing an IDLH atmosphere in the absence of a hospital in close proximity to the jobsite.
Recent events (2)
  • — I (S) $0
  • — Z (S) $16550

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348472143.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.