OSHA Inspection: FIRST LINE COATINGS, INC

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of FIRST LINE COATINGS, INC in 901 WEST 12TH STREET SUITE 204, ERIE, PA 16501 (NAICS 332812). OSHA activity number 348482720.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch First Line Coatings, INC — free Get an email when a new federal OSHA severe-injury report for First Line Coatings, INC is published. One employer, no account, unsubscribe in one click.
Site address
901 WEST 12TH STREET SUITE 204
City
ERIE
State
PA
ZIP
16501
Mailing
901 WEST 12TH STREET, ERIE, PA 16501
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
332812
Employees
8
Ownership type
A

6 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 3, 2026
Abate by
Mar 27, 2026
Penalty
Initial $4,965 · Current $2,000 Reduced
OSH ACT of 1970 Section (5)(a)(1):The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were operating a forklift without using a seatbelt which exposed employees to potential crushing and struck-by hazards:  A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: An employee was operating the Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084 to move the Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A without utilizing the operator restraint system (i.e.-seatbelt).  The employee jumped off of the Yale LP Forklift  into Dock 10A.  The forklift landed on the employee resulting in fatal injuries.    ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $4965

1910.178 A04

Serious Gravity 10 2 instances 2 exposed
Issued
Mar 3, 2026
Abate by
Jun 12, 2026
Penalty
Initial $4,965 · Current $2,000 Reduced
29 CFR  1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval:   A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: Fork extender attachments were being used with sit down forklifts including, but not limited to, Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084 .  Fork Extenders were being used in conjunction with "free rigging" to lower the Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A.  The employer had not received prior written permission from the forklift manufacturer to use the attachment.  B.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto rigging equipment including but not limited to synthetic straps were placed on the forks of the Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084 .  "Free rigging" was being used to lower the Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A.  The employer had not received prior written permission from the forklift manufacturer to conduct free rigging.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $4965

1910.178 A05

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 3, 2026
Abate by
Jun 12, 2026
Penalty
Initial $0 · Current $0
29 CFR  1910.178(a)(5): The powered industrial truck was equipped with front-end attachments other than factory installed attachments, however the employer did not request that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered:   A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: Fork extender attachments were being used with sit down forklifts including, but not limited to, Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084.  Fork Extenders were being used in conjunction with "free rigging" to lower the Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A. The employer had not obtained a new forklift plate to identify the attachment and changes in lifting limitations.  B.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto rigging equipment including but not limited to synthetic straps were placed on the forks of the Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084.  "Free rigging" was being used to lower the Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A.  The employer had not obtained a new forklift plate to identify the attachment and changes in lifting limitations.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.178 M06

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 3, 2026
Abate by
May 15, 2026
Penalty
Initial $16,550 · Current $13,000 Reduced
29 CFR  1910.178(m)(6): The employer did not ensure that safe distance was maintained from the edge of ramps or platforms while on any elevated dock, or platform or freight car.   A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: An employee was operating the Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084 to move Presto PowerStak Model No. PPS1100-62-CB Serial No. V185980-ST2212051 from Dock 10B to 10A.  A safe distance was not maintained between the forklift and the edge of Dock 10B.  The forklift went over the edge of the docks and landed on the employee resulting in fatal injuries.      ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (S) $13000
  • — Z (S) $16550

1910.178 L04 III

Other-than-serious 1 instance 3 exposed
Issued
Mar 3, 2026
Abate by
Apr 15, 2026
Penalty
Initial $0 · Current $0
29 CFR  1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years:  A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: employees that operated powered industrial trucks including but not limited to, Yale LP Forklift Serial No. 09042495021352-05  Model No. GLP030BFNUAE084 had not received an operator evaluation every 3 years.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.184 I01

Other-than-serious 1 instance 2 exposed
Issued
Mar 3, 2026
Abate by
Mar 27, 2026
Penalty
Initial $0 · Current $0
29 CFR  1910.184(i)(1): Synthetic web sling(s) were not marked or coded to show rated capacities for each type of hitch and type of synthetic web material:  A.) First Line Coatings, Inc, Dock Area, On 9/4/25 and times prior thereto: Synthetic Web slings were placed on the forks of the Yale LP Forklift Serial 09042495021352-05 to lower the Presto PowerStak Model # PPS1100-62-CB from Dock 10B to 10A. Rated capacity information was worn off or unable to be read on slings in the area.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation.  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348482720.