FARRELL, PA —
OSHA Inspection: PREMIER HYDRAULICS LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of PREMIER HYDRAULICS LLC in 10 FRUIT AVENUE, FARRELL, PA 16121 (NAICS 332710). OSHA activity number 348526013.
Where did this inspection happen?
- Establishment
- PREMIER HYDRAULICS LLC
- Site address
- 10 FRUIT AVENUE
- City
- FARRELL
- State
- PA
- ZIP
- 16121
- Mailing
- 10 FRUIT AVENUE, FARRELL, PA 16121
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332710
- Employees
- 50
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 D
- Issued
- Abate by
- Penalty
- Initial $5788.00 · Current $2800.00 Reduced
General-duty citation text
29 CFR 1910.147(d):The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): A.) Premier Hydraulics LLC, on or about 9/25/25 and times prior thereto: Employees did not lockout prior to conducting servicing operations on equipment including but not limited to CNC Mills and Lathes. Employees are periodically required to conduct cleaning operations from the front and side of the machine. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $2800
- — Z (S) $5788
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i):The training program of the employer did not include all the training elements listed under Items A-C of 29 CFR 1910.147(c)(7)(i): A.) Premier Hydraulics LLC, on or about 9/25/25 and times prior thereto: The lockout/tagout training program did not cover the definition of servicing and maintenance noted in the 29 CFR 1910.147(b). As a result, employees were not provided with the knowledge when lockout needs to occur on the machines and equipment present in the workplace. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: A.) Premier Hydraulics LLC, on or about 9/25/25 and times prior thereto: Employees were performing service and maintenance activities on equipment including, but not limited to, Hardinge Lather Model SV-200, Fadal Mill Model 904-1, and Hardinger Lathe Model GS-51. The employer did not certify that periodic inspections of energy control procedures were conducted on an annual basis. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at PREMIER HYDRAULICS LLC
FARRELL, PA—2024-09-20 00:00:00
PREMIER HYDRAULICS LLC
View PREMIER HYDRAULICS LLC's full OSHA safety record →
More inspections in this industry (NAICS 332710)
WIXOM, MI—2026-07-16 00:00:00
MANSON MANUFACTURING LLC DBA TOMCO MANUFACTURING
CLAWSON, MI—2026-07-16 00:00:00
FOUR WAY INDUSTRIES INC
CLAWSON, MI—2026-07-16 00:00:00
FOUR WAY INDUSTRIES INC
CLARKLAKE, MI—2026-07-15 00:00:00
CLARKLAKE MACHINE INC
MUSKEGON HEIGHTS, MI—2026-07-15 00:00:00
L. THOMPSON COMPANY LLC DBA TOTAL QUALITY MACHINING
More inspections in PA
PHILADELPHIA, PA—2026-07-16 00:00:00
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16 00:00:00
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16 00:00:00
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15 00:00:00
DREAM GREENER LAWN & LANDSCAPE
COCHRANTON, PA—2026-07-15 00:00:00
CRAWFORD COUNTY HARDWOODS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348526013.